API 1104 · ASME B31.3
NPS 36 narrow compound groove with SAW
A large rotated girth weld is planned with a narrow outer bevel and a high deposition process.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCycle time budget · 81.16 min planned vs 95 min budget.
Result details
| Deposited filler per joint | 4.128 kg |
|---|---|
| Estimated passes | 6 |
| Joint arc time | 49.16 min |
| Total joint cycle | 81.16 min |
| Effective wall | 19.05 mm |
| Pipe outside diameter | 914.4 mm |
| Pipe bore | 876.3 mm |
| Groove centroid circumference | 2,825.87 mm |
| Outside circumference | 2,872.67 mm |
| Root circumference | 2,752.98 mm |
| Groove mouth width | 13.024 mm |
| Uncapped groove section | 168.927 mm² |
| Groove and cap volume | 525.89 cm³ |
| Filler purchase per joint | 4.213 kg |
| Root passes | 1 |
| Hot passes | 1 |
| Fill passes | 3 |
| Cap beads | 1 |
| Cycle time margin | 13.84 min |
Worked example
Starting inputs
- Nominal pipe size
- NPS 36
- Wall source
- Schedule 40
- Bevel profile
- Compound V
- Primary included angle
- 65 °
- Outer included angle
- 16 °
- Depth to bevel break
- 5.8 mm
- Root opening
- 2.5 mm
Baseline results
- Deposited filler per joint
- 4.128 kg
- Estimated passes
- 6
- Joint arc time
- 49.16 min
- Total joint cycle
- 81.16 min
The 168.927 mm² groove runs around a 2,825.87 mm centroid circumference before cap allowance. The sequence adds 1 root, 1 hot, 3 fill and 1 cap passes over 49.16 min of arc time.
Try it. The estimate treats the root, fill and cap as separate revolutions. Confirm root-process speed against the actual sequence.
Calculation method
V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed
The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.
Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.
Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.