NPS 24 measured-wall line pipe

The incoming pipe lot is measured at 15.9 mm wall. Use measured thickness for the filler and time plan.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Pipe & preparation
mm
°
mm
mm
%
Passes & cycle
kg/m³
mm²
mm
mm/min
mm/min
mm/min
min
min

Live weld sheet

Updated from inputs
Girth-weld groove sectionDeposited filler per joint 2.488 kg. Estimated passes 8. Joint arc time 72.09 min. Total joint cycle 100.09 min NET FILLER2.488kgPASS COUNT8ARC TIME72.09minJOINT CYCLE100.09min GIRTH-WELD GROOVE SECTION Wall 15.9 mmR1 · H1 · F4 · C2NPS 24 CYCLE TIME BUDGETFAIL
Outside screen

Cycle time budget · 100.09 min planned vs 90 min budget.

Result details

Deposited filler per joint2.488 kg
Estimated passes8
Joint arc time72.09 min
Total joint cycle100.09 min
Effective wall15.9 mm
Pipe outside diameter609.6 mm
Pipe bore577.8 mm
Groove centroid circumference1,880.49 mm
Outside circumference1,915.11 mm
Root circumference1,815.21 mm
Groove mouth width18.681 mm
Uncapped groove section152.943 mm²
Groove and cap volume316.9 cm³
Filler purchase per joint3.034 kg
Root passes1
Hot passes1
Fill passes4
Cap beads2
Cycle time margin-10.09 min

Worked example

Starting inputs

Nominal pipe size
NPS 24
Wall source
Measured wall
Measured wall thickness
15.9 mm
Primary included angle
60 °
Root opening
2.4 mm
Root land
1.8 mm
Overall filler process
FCAW

Baseline results

Deposited filler per joint
2.488 kg
Estimated passes
8
Joint arc time
72.09 min
Total joint cycle
100.09 min

The 152.943 mm² groove runs around a 1,880.49 mm centroid circumference before cap allowance. The sequence adds 1 root, 1 hot, 4 fill and 2 cap passes over 72.09 min of arc time.

Try it. A larger pipe has a longer seam per pass. Extra beads add a full revolution to the planned arc time.

Calculation method

V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed

The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.

Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.

Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.