CleanroomVentLab · Calculation sheet · US customary
Cooling-dominant laboratory
Inputs
- Clear sash width
- 5 ft
- Working height
- 18 in
- Reduced height
- 10 in
- Target face velocity
- 90 FPM
- Exhaust control
- Variable air volume (VAV)
- Unoccupied VAV flow
- 35 %
- Occupied hours per year
- 4,400 h
- Heating degree-hours
- 5,400 °F·h
- Cooling degree-hours
- 106,200 °F·h
- Heating efficiency
- 0.9
- Cooling COP
- 2.8
- Heating input energy rate
- 0.09 /kWh
- Cooling input energy rate
- 0.25 /kWh
- Cost display currency
- USD · US dollar
Results
- Working flow
- 675 CFM
- Reduced flow
- 375 CFM
- Energy saved
- 7.14898 MMBtu
- Cost saved
- 478.003 USD
- Working face velocity
- 90 FPM
- Reduced face velocity
- 90 FPM
- Unoccupied exhaust
- 236.25 CFM
- Annual mean flow, working
- 456.627 CFM
- Annual mean flow, reduced
- 305.942 CFM
- Working heating input
- 2.95897 MMBtu
- Working cooling input
- 18.7049 MMBtu
- Working total energy
- 21.6639 MMBtu
- Reduced total energy
- 14.5149 MMBtu
- Working annual cost
- 1,448.51 USD
- Reduced annual cost
- 970.509 USD
The sash comparison uses a shared VAV minimum. Verify containment at both operating positions.
For preliminary engineering and EHS / Industrial Hygiene review. Design calculations do not replace review by a licensed professional engineer (PE) and a certified industrial hygienist (CIH), commissioning tests, ISO 14644 classification or certification, or assessment against the applicable NFPA 86 edition.
https://calcsheetlab.com/cleanroomventlab/laboratory-fume-hood-airflow-cost-calculator/cooling-dominant-lab/