Worked example · Thermal packaging

Frozen shipper with −21 °C phase packs

A frozen payload uses a pack with a phase-change temperature below its target.

Reserve hold
13.1h
Heat leak
21.72W
Coolant use
0.367kg/h
Nominal hold
17.7h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg
kJ/kg

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient30 °CPayload target-17 °CHeat leak 21.7 WLatent-energy budget0 h17.7 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
1.19m²
Wall R-value
2.58m²·K/W
Latent energy available
1,385kJ
Phase-change enthalpy
213kJ/kg
Coolant phase temperature
-21°C
Hold time set aside
4.6h
Ambient-to-payload difference
47K
Heat leak with cavity at coolant phase temp.
23.57W

Work through this case

  1. Coolant phase temperature -21°C
  2. Coolant use 0.367kg/h
  3. Reserve hold 13.1h

Use the measured enthalpy for the selected pack. The usable temperature difference between pack and payload is small here, so verify the actual payload temperature spread.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What should I check in the frozen shipper with −21 °c phase packs example?

Use the measured enthalpy for the selected pack. The usable temperature difference between pack and payload is small here, so verify the actual payload temperature spread.