The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.
Calculation breakdown
Mid-wall heat-transfer area
1.19m²
Wall R-value
2.58m²·K/W
Latent energy available
1,385kJ
Phase-change enthalpy
213kJ/kg
Coolant phase temperature
-21°C
Hold time set aside
4.6h
Ambient-to-payload difference
47K
Heat leak with cavity at coolant phase temp.
23.57W
Work through this case
Coolant phase temperature-21°C
Coolant use0.367kg/h
Reserve hold13.1h
Use the measured enthalpy for the selected pack. The usable temperature difference between pack and payload is small here, so verify the actual payload temperature spread.
More worked examples
Open a case with its assumptions loaded, then edit the inputs.
R = thickness / k • Q = A × (Tambient − Tpayload) / R
Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.
Coolant consumption
Rate = 3.6 × Q(W) / L(kJ/kg)
Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.
Reserve and qualification
treserve = m / rate × (1 − reserve fraction)
Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.
What should I check in the frozen shipper with −21 °c phase packs example?
Use the measured enthalpy for the selected pack. The usable temperature difference between pack and payload is small here, so verify the actual payload temperature spread.
ColdChainLab · Engineering calculation
Frozen shipper with −21 °C phase packs
Metric SI · https://calcsheetlab.com/coldchainlab/dry-ice-shipper-hold-time/minus-21-frozen-gel-bricks/
Inputs
Interior length
0.48 m
Interior width
0.36 m
Interior height
0.32 m
Insulation thickness
62 mm
Insulation preset
Rigid polyurethane (PUR)
Effective conductivity
0.024 W/(m·K)
Ambient temperature
30 °C
Payload target temperature
-17 °C
Latent-energy reserve
26 %
Coolant
Phase-change pack (−21 °C)
Coolant mass
6.5 kg
Pack enthalpy at phase change
213 kJ/kg
Results
Reserve hold
13.1h
Heat leak
21.72W
Coolant use
0.367kg/h
Nominal hold
17.7h
Mid-wall heat-transfer area
1.19m²
Wall R-value
2.58m²·K/W
Latent energy available
1,385kJ
Phase-change enthalpy
213kJ/kg
Coolant phase temperature
-21°C
Hold time set aside
4.6h
Ambient-to-payload difference
47K
Heat leak with cavity at coolant phase temp.
23.57W
Use these estimates for preliminary engineering. Verify results against validated cold-chain qualification protocols, applicable ASHRAE Standards 15 and 34, and local food and pharmaceutical regulations. Use manufacturer data, measured operating conditions, and approved acceptance criteria before acting on a result.