Payload reactions
Wₐ = W × b/(a + b), Wᵦ = W × a/(a + b)
Use projected horizontal distances from CG to the vertical lines. For unrotated lug coordinates, rotate them to the specified attitude before resolving reactions.
OSHA 1926.1432 · Multiple cranes
The 9,000 lb equalizer CG is 72% of the way from hook A to hook B. The payload CG is nearer A.
Schematic geometry. Margin bars mark 100% of the entered limit.
Compare these results with the approved equipment and lift plan.
Resolve the equalizer and payload as separate loads. Add the individual hook gear before applying the chart cap.
Gross demand on crane A 46,720 lb · Gross demand on crane B 36,180 lb
Wₐ = W × b/(a + b), Wᵦ = W × a/(a + b)
Use projected horizontal distances from CG to the vertical lines. For unrotated lug coordinates, rotate them to the specified attitude before resolving reactions.
Gross share = payload share + beam share + hook gear
Use the beam CG location for its share. With gross chart capacities, include each hook block and applicable chart deductions once in gear.
Margin = 0.75 × chart capacity − gross share
The 75% cap is this tool’s planning assumption. Site procedures and the actual OEM load chart govern.
Use the weakest chart point at each actual radius, boom configuration and set-up. A qualified person must plan the lift under OSHA 1926.1432 where it applies. This is a static snapshot for vertical lines. Review dynamic load transfer and any off-plumb line separately.
CraneRiggingLab · Lift screening worksheet
OSHA 1926.1432 · Multiple cranes · US · lb
Screening estimates only. Have a qualified rigger and a professional engineer (PE), where required, review the lift plan. Use the OEM chart for the actual configuration.
Use the weakest chart point at each actual radius, boom configuration and set-up. A qualified person must plan the lift under OSHA 1926.1432 where it applies. This is a static snapshot for vertical lines. Review dynamic load transfer and any off-plumb line separately.