OSHA 1926.1432 · Multiple cranes

Payload CG directly below one hook

A 22,000 lb fixture has a payload CG below hook B at the modeled lift attitude. The beam still has a centered CG.

Inputs

Payload and beam
lb
ft
ft
lb
%
Projected horizontal position, 0% at A and 100% at B.
Chart at worst lift position
lb
lb
lb
lb
Back to results ↑

Results

Static screeningEdit inputs ↓
Dual-hook free-body sketchCRANE A LOAD1,600lbCRANE B LOAD23,500lbA CAP MARGIN12,650lbB CAP MARGIN11,000lbCRANE ACRANE BPAYLOAD CG / HOOK SPANA / 75% chart cap11.23%B / 75% chart cap68.12%Crane ACrane BPayload centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results
  • Payload CG is at a hook. A small shift can transfer load or slacken the opposite line.
Gross demand on crane A
1,600 lb
Gross demand on crane B
23,500 lb
Crane A margin to 75% cap
12,650 lb
Crane B margin to 75% cap
11,000 lb
Crane A chart capacity used
8.42 %
Crane B chart capacity used
51.09 %
Combined lifted weight
25,100 lb

At this static boundary A carries only its gear and beam share. A small change in position can unload that line.

Gross demand on crane A 1,600 lb · Gross demand on crane B 23,500 lb

Payload reactions

Wₐ = W × b/(a + b), Wᵦ = W × a/(a + b)

Use projected horizontal distances from CG to the vertical lines. For unrotated lug coordinates, rotate them to the specified attitude before resolving reactions.

Gross hook demands

Gross share = payload share + beam share + hook gear

Use the beam CG location for its share. With gross chart capacities, include each hook block and applicable chart deductions once in gear.

Screening margin

Margin = 0.75 × chart capacity − gross share

The 75% cap is this tool’s planning assumption. Site procedures and the actual OEM load chart govern.

Use the weakest chart point at each actual radius, boom configuration and set-up. A qualified person must plan the lift under OSHA 1926.1432 where it applies. This is a static snapshot for vertical lines. Review dynamic load transfer and any off-plumb line separately.