540 V DC bus at a 1.70 V cell cutoff
The nominal 540 V bus is supplying a 360 kW inverter load at the selected cell cutoff voltage.
Engineering schematic
DC battery bus & inverter
Runtime headroom 13.2 min
Inputs
Calculation details
| Measure | Value |
|---|---|
| Series cells per string | 270 cells |
| End-of-discharge bus voltage | 459 V |
| Inverter DC input | 378.95 kW |
| Bank discharge current at cutoff | 825.59 A |
| Discharge current per installed string | 206.4 A |
| Installed bank capacity at C20 | 660 Ah |
| Bank C20 reference current | 33 A |
| Minimum modeled C20 bank capacity | 355.74 Ah |
| Parallel strings required for target | 3 strings |
| Modeled autonomy at entered load | 25.19 min |
| Runtime headroom against target | 13.19 min |
| UPS inverter heat | 18.95 kW |
| UPS inverter heat | 64,651 Btu/h |
| Amp-hours withdrawn in modeled discharge | 346.65 Ah |
| Bulk charge time to recover 90% of withdrawn Ah | 4.59 h |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply 270 cells by 1.7 V to get 459 V at cutoff. The inverter draws 825.59 A DC at this voltage.
- Apply Peukert’s exponent to 660 Ah of C20 capacity. The model gives 25.19 minutes and requires 3 strings for the target.
Read the cutoff voltage and current together. At fixed DC power, current rises as battery voltage falls.
Calculation method
- Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
- Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
- Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)
The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.
Engineering limits
Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.
Related worked examples
DataCenterPUELab · Calculation sheet
540 V DC bus at a 1.70 V cell cutoff
Runtime headroom 13.2 min
Inputs
- IT load on UPS
- 360 kW
- Inverter efficiency
- 95 %
- Nominal DC bus
- 540 V DC
- End-of-discharge voltage
- 1.7 V/cell
- Target backup time
- 12 min
- C20 capacity per string
- 165 Ah
- Parallel strings installed
- 4
- Peukert exponent
- 1.2
- Available charger current
- 80 A
- Charge efficiency
- 85 %
Results
- Series cells per string
- 270 cells
- End-of-discharge bus voltage
- 459 V
- Inverter DC input
- 378.95 kW
- Bank discharge current at cutoff
- 825.59 A
- Discharge current per installed string
- 206.4 A
- Installed bank capacity at C20
- 660 Ah
- Bank C20 reference current
- 33 A
- Minimum modeled C20 bank capacity
- 355.74 Ah
- Parallel strings required for target
- 3 strings
- Modeled autonomy at entered load
- 25.19 min
- Runtime headroom against target
- 13.19 min
- UPS inverter heat
- 18.95 kW
- UPS inverter heat
- 64,651 Btu/h
- Amp-hours withdrawn in modeled discharge
- 346.65 Ah
- Bulk charge time to recover 90% of withdrawn Ah
- 4.59 h
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.