Inverter heat in a small UPS room

A 72 kW IT load runs behind a 92% efficient inverter with two 120 Ah battery strings.

Engineering schematic

DC battery bus & inverter

Live
DC battery bus & inverter RUN TIME 44.7 min. DC DRAW 186.3 A. STRINGS REQ 1. UPS HEAT 6.3 kW. See the results table for the full readout. RUN TIME44.7minDC DRAW186.3ASTRINGS REQ1UPS HEAT6.3kW Battery bank2 strings420 VInverterIT load72 kWRecharge path · 45 ATarget runtime / modeled autonomy0%34% usedLimit 100%

Runtime headroom 29.7 min

Inputs

UPS and DC bus
kW
%
V/cell
min
Lead-acid battery bank

Use the charger current available to the battery bank while the UPS serves the load.

Ah
A
%

Calculation details

MeasureValue
Series cells per string240 cells
End-of-discharge bus voltage420 V
Inverter DC input78.26 kW
Bank discharge current at cutoff186.34 A
Discharge current per installed string93.17 A
Installed bank capacity at C20240 Ah
Bank C20 reference current12 A
Minimum modeled C20 bank capacity96.7 Ah
Parallel strings required for target1 strings
Modeled autonomy at entered load44.65 min
Runtime headroom against target29.65 min
UPS inverter heat6.26 kW
UPS inverter heat21,363 Btu/h
Amp-hours withdrawn in modeled discharge138.67 Ah
Bulk charge time to recover 90% of withdrawn Ah3.26 h

Starting calculation

  1. Multiply 240 cells by 1.75 V to get 420 V at cutoff. The inverter draws 186.34 A DC at this voltage.
  2. Apply Peukert’s exponent to 240 Ah of C20 capacity. The model gives 44.65 minutes and requires 1 strings for the target.

Use inverter heat when sizing room sensible cooling. Include charger heat and auxiliary loads separately.

Calculation method

  • Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
  • Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
  • Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)

The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.

Engineering limits

Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.