Phase-matched ATS for single-cord loads
A rack transfer switch allows single-cord loads to move to the surviving 415/240 V feed on matching phases.
Engineering schematic
Wye A/B rack distribution
Failover breaker headroom 1.3 A
Inputs
Calculation details
| Measure | Value |
|---|---|
| Total normal rack load | 20.3 kW |
| 80% continuous limit per phase | 32 A |
| Highest phase current after failover | 30.7 A |
| Minimum continuous-breaker headroom | 1.3 A |
| Highest fundamental neutral current | 2.74 A |
| Balanced real-power limit per whip | 21.89 kW |
| A normal · L1 | 16.67 A |
| A normal · L2 | 13.6 A |
| A normal · L3 | 14.47 A |
| B normal · L1 | 14.04 A |
| B normal · L2 | 14.91 A |
| B normal · L3 | 15.35 A |
| A surviving · L1 | 30.7 A |
| A surviving · L2 | 28.51 A |
| A surviving · L3 | 29.82 A |
| B surviving · L1 | 30.7 A |
| B surviving · L2 | 28.51 A |
| B surviving · L3 | 29.82 A |
| A normal · neutral | 2.74 A |
| B normal · neutral | 1.16 A |
| A surviving · neutral | 1.91 A |
| B surviving · neutral | 1.91 A |
| A normal · phase imbalance | 11.76 % |
| B normal · phase imbalance | 4.95 % |
| A surviving · phase imbalance | 3.94 % |
| B surviving · phase imbalance | 3.94 % |
| Rack load shed on loss of A | 0 kW |
| Rack load shed on loss of B | 0 kW |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply the 40 A breaker rating by 0.80 to get 32 A continuous per phase.
- Convert each phase load at 240 V line-to-neutral and PF 0.95. The highest surviving phase reaches 30.7 A, giving 1.3 A headroom.
The model assumes phase mapping is preserved. Confirm the actual transfer switch wiring and ratings.
Calculation method
- Iphase = 1,000 × kWphase ÷ (VLN × PF)
- Ineutral = √(Ia² + Ib² + Ic² − IaIb − IbIc − IcIa)
- Continuous current limit = 0.80 × breaker rating
Use nominal line-to-neutral voltage and phase-to-neutral real kW. Imbalance is largest deviation from the phase mean divided by that mean. Transferable loads from the failed whip are added to corresponding phases on the survivor. Non-transferable single-cord loads on the failed whip drop.
Engineering limits
The neutral model uses fundamental currents with a common power factor and 120° phase spacing. Check harmonic neutral current, conductor ampacity, breaker listing and local code separately. The screen uses 80% of a standard-rated breaker for a continuous load of three hours or more.
Related worked examples
DataCenterPUELab · Calculation sheet
Phase-matched ATS for single-cord loads
Failover breaker headroom 1.3 A
Inputs
- Wye service
- 415 V / 240 V
- Breaker rating per whip
- 40 A
- Load power factor
- 0.95
- Non-transferable load
- 0 %
- A · L1
- 3.8 kW
- A · L2
- 3.1 kW
- A · L3
- 3.3 kW
- B · L1
- 3.2 kW
- B · L2
- 3.4 kW
- B · L3
- 3.5 kW
Results
- Total normal rack load
- 20.3 kW
- 80% continuous limit per phase
- 32 A
- Highest phase current after failover
- 30.7 A
- Minimum continuous-breaker headroom
- 1.3 A
- Highest fundamental neutral current
- 2.74 A
- Balanced real-power limit per whip
- 21.89 kW
- A normal · L1
- 16.67 A
- A normal · L2
- 13.6 A
- A normal · L3
- 14.47 A
- B normal · L1
- 14.04 A
- B normal · L2
- 14.91 A
- B normal · L3
- 15.35 A
- A surviving · L1
- 30.7 A
- A surviving · L2
- 28.51 A
- A surviving · L3
- 29.82 A
- B surviving · L1
- 30.7 A
- B surviving · L2
- 28.51 A
- B surviving · L3
- 29.82 A
- A normal · neutral
- 2.74 A
- B normal · neutral
- 1.16 A
- A surviving · neutral
- 1.91 A
- B surviving · neutral
- 1.91 A
- A normal · phase imbalance
- 11.76 %
- B normal · phase imbalance
- 4.95 %
- A surviving · phase imbalance
- 3.94 %
- B surviving · phase imbalance
- 3.94 %
- Rack load shed on loss of A
- 0 kW
- Rack load shed on loss of B
- 0 kW
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.