High-rate discharge string count
A 750 kW load, 160 Ah strings and exponent 1.26 test a short high-current ride-through period.
Engineering schematic
DC battery bus & inverter
Runtime headroom -7.8 min
Inputs
Calculation details
| Measure | Value |
|---|---|
| Series cells per string | 240 cells |
| End-of-discharge bus voltage | 420 V |
| Inverter DC input | 781.25 kW |
| Bank discharge current at cutoff | 1,860.12 A |
| Discharge current per installed string | 465.03 A |
| Installed bank capacity at C20 | 640 Ah |
| Bank C20 reference current | 32 A |
| Minimum modeled C20 bank capacity | 1,148.63 Ah |
| Parallel strings required for target | 8 strings |
| Modeled autonomy at entered load | 7.18 min |
| Runtime headroom against target | -7.82 min |
| UPS inverter heat | 31.25 kW |
| UPS inverter heat | 106,629 Btu/h |
| Amp-hours withdrawn in modeled discharge | 222.56 Ah |
| Bulk charge time to recover 90% of withdrawn Ah | 1.57 h |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply 240 cells by 1.75 V to get 420 V at cutoff. The inverter draws 1,860.12 A DC at this voltage.
- Apply Peukert’s exponent to 640 Ah of C20 capacity. The model gives 7.18 minutes and requires 8 strings for the target.
Compare the calculated minimum string count with installed strings. The estimate reflects the effect of the entered exponent at high current.
Calculation method
- Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
- Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
- Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)
The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.
Engineering limits
Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.
Related worked examples
DataCenterPUELab · Calculation sheet
High-rate discharge string count
Runtime headroom -7.8 min
Inputs
- IT load on UPS
- 750 kW
- Inverter efficiency
- 96 %
- Nominal DC bus
- 480 V DC
- End-of-discharge voltage
- 1.75 V/cell
- Target backup time
- 15 min
- C20 capacity per string
- 160 Ah
- Parallel strings installed
- 4
- Peukert exponent
- 1.26
- Available charger current
- 150 A
- Charge efficiency
- 85 %
Results
- Series cells per string
- 240 cells
- End-of-discharge bus voltage
- 420 V
- Inverter DC input
- 781.25 kW
- Bank discharge current at cutoff
- 1,860.12 A
- Discharge current per installed string
- 465.03 A
- Installed bank capacity at C20
- 640 Ah
- Bank C20 reference current
- 32 A
- Minimum modeled C20 bank capacity
- 1,148.63 Ah
- Parallel strings required for target
- 8 strings
- Modeled autonomy at entered load
- 7.18 min
- Runtime headroom against target
- -7.82 min
- UPS inverter heat
- 31.25 kW
- UPS inverter heat
- 106,629 Btu/h
- Amp-hours withdrawn in modeled discharge
- 222.56 Ah
- Bulk charge time to recover 90% of withdrawn Ah
- 1.57 h
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.