DataCenterPUELab

Air duty after liquid heat capture

A liquid-assisted row rejects 17 kW into the room. Add the room sensible load to size the remaining air supply.

Engineering schematic

Sensible air path

Live
Sensible air path SUPPLY FLOW 1.15 m³/s. RACK ΔT 15 K. SENSIBLE 19 kW. DENSITY 1.2 kg/m³. See the results table for the full readout. SUPPLY FLOW1.15m³/sRACK ΔT15KSENSIBLE19kWDENSITY1.2kg/m³ CRAC/CRAH98% SHRHot returnCold aisle1.05 m³/s15 Krack rise8.8% delivery lossSensible load / rated sensible capacity0%75% usedLimit 100%

Sensible capacity headroom 6.5 kW

Inputs

Rack and cooling unit
kW
kW
kWₜₕ
%
Air path

Bypass and recirculation reduce the fraction of supply air that delivers effective rack cooling.

K
m
%
%

Calculation details

MeasureValue
Rack and room sensible load19 kW
Air density at site elevation1.2 kg/m³
Effective delivery fraction91.18 %
Rack air temperature rise15 K
Useful rack airflow1.049 m³/s
Required or measured supply airflow1.151 m³/s
Airflow delivery penalty0.101 m³/s
Total coil duty at entered SHR19.39 kWₜₕ
Rated sensible coil capacity25.48 kWₜₕ
Rated latent coil capacity0.52 kWₜₕ
Sensible capacity headroom6.48 kW

Starting calculation

  1. Add IT and room heat for 19 kW sensible. The bypass and recirculation assumptions give 91.18% effective delivery.
  2. At 15 K and 1.2 kg/m³, the required fan supply is 1.151 m³/s (2,438 CFM).

Enter the residual load from the CDU calculator as IT heat rejected to air.

Calculation method

  • Q (m³/s) = sensible kW ÷ (ρ × 1.006 × ΔT)
  • CFM ≈ 3.16 × W ÷ ΔT°F at reference density
  • Supply airflow = useful airflow ÷ [(1 − bypass) × (1 − recirculation)]

Use sea-level reference density of 1.20 kg/m³, adjusted by standard atmospheric pressure ratio at the entered elevation, with fixed specific heat. Rated sensible coil capacity is nameplate total capacity times SHR.

Engineering limits

The recirculation factor is a delivery estimate. Use measured inlet and return conditions, fan curves and site air balancing for equipment selection. A very high calculated ΔT calls for review of the assumed load and airflow.