Inverter heat in a small UPS room
A 72 kW IT load runs behind a 92% efficient inverter with two 120 Ah battery strings.
Engineering schematic
DC battery bus & inverter
Runtime headroom 29.7 min
Inputs
Calculation details
| Measure | Value |
|---|---|
| Series cells per string | 240 cells |
| End-of-discharge bus voltage | 420 V |
| Inverter DC input | 78.26 kW |
| Bank discharge current at cutoff | 186.34 A |
| Discharge current per installed string | 93.17 A |
| Installed bank capacity at C20 | 240 Ah |
| Bank C20 reference current | 12 A |
| Minimum modeled C20 bank capacity | 96.7 Ah |
| Parallel strings required for target | 1 strings |
| Modeled autonomy at entered load | 44.65 min |
| Runtime headroom against target | 29.65 min |
| UPS inverter heat | 6.26 kW |
| UPS inverter heat | 21,363 Btu/h |
| Amp-hours withdrawn in modeled discharge | 138.67 Ah |
| Bulk charge time to recover 90% of withdrawn Ah | 3.26 h |
Update the highlighted inputs to see the results.
Starting calculation
- Multiply 240 cells by 1.75 V to get 420 V at cutoff. The inverter draws 186.34 A DC at this voltage.
- Apply Peukert’s exponent to 240 Ah of C20 capacity. The model gives 44.65 minutes and requires 1 strings for the target.
Use inverter heat when sizing room sensible cooling. Include charger heat and auxiliary loads separately.
Calculation method
- Idc = IT kW × 1,000 ÷ (ηinv × cell count × Vcutoff)
- Peukert hours = 20 × [(bank C20 ÷ 20) ÷ Idc]ᵏ
- Charge recovery hours = 0.90 × Ah withdrawn ÷ (charger A × charge efficiency)
The nominal 480 V or 540 V bus uses 240 or 270 nominal 2 V cells in series per string. Current is held at the calculated end-of-discharge value. Runtime is capped at the nominal amp-hour limit at low current. Recharge assumes a constant available charger current during bulk charge.
Engineering limits
Use vendor constant-power discharge tables, temperature and aging corrections, and the full duty cycle for IEEE 485 sizing. The estimate covers lead-acid batteries. Recovery time refers to amp-hours withdrawn in the modeled discharge, with charger taper and float omitted.
Related worked examples
DataCenterPUELab · Calculation sheet
Inverter heat in a small UPS room
Runtime headroom 29.7 min
Inputs
- IT load on UPS
- 72 kW
- Inverter efficiency
- 92 %
- Nominal DC bus
- 480 V DC
- End-of-discharge voltage
- 1.75 V/cell
- Target backup time
- 15 min
- C20 capacity per string
- 120 Ah
- Parallel strings installed
- 2
- Peukert exponent
- 1.2
- Available charger current
- 45 A
- Charge efficiency
- 85 %
Results
- Series cells per string
- 240 cells
- End-of-discharge bus voltage
- 420 V
- Inverter DC input
- 78.26 kW
- Bank discharge current at cutoff
- 186.34 A
- Discharge current per installed string
- 93.17 A
- Installed bank capacity at C20
- 240 Ah
- Bank C20 reference current
- 12 A
- Minimum modeled C20 bank capacity
- 96.7 Ah
- Parallel strings required for target
- 1 strings
- Modeled autonomy at entered load
- 44.65 min
- Runtime headroom against target
- 29.65 min
- UPS inverter heat
- 6.26 kW
- UPS inverter heat
- 21,363 Btu/h
- Amp-hours withdrawn in modeled discharge
- 138.67 Ah
- Bulk charge time to recover 90% of withdrawn Ah
- 3.26 h
Screening estimate. Confirm against facility and manufacturer data for engineering decisions.