Formulas and assumptions

T = KDF
Use N of clamp force and meters of nominal bolt diameter to get N·m. The worksheet can invert the equation to estimate F from torque.
Fproof = Sproof Aₜ
Tensile stress area is π(D − cP)²/4. Use c = 0.938194 for metric and 0.9743 for Unified threads. P is pitch.
dᵈʳⁱˡˡ = D − (% thread)P / 76.98
This is a cut tap geometry estimate. Enter a candidate drill to see the achieved percentage of nominal thread height.

Engineering references

Frequently asked questions

Can I reuse a dry bolt torque after applying anti-seize?

Use the assembly specification for the exact lubricant. At a fixed torque, a lower K raises estimated preload and can overload the fastener.

Can I use the cut-tap drill diameter for a thread-forming tap?

Forming taps displace material and use a larger hole. Use the toolmaker’s drill range for the workpiece and tap.