Worked example

Bolt proof load 28,429.09 lbf

  1. For 10 TPI use a 0.100 in pitch. Subtract 0.9743 times the pitch from 0.750 in, square the result and multiply by π/4.
  2. Multiply area by 85,000 psi for the proof load. Use the 75% utilization in the worksheet for the target clamp force.

Before using this result. Check actual bolt range, mating nut grade and structural joint requirements. This dry torque assumption describes a single fastener and one assembly condition.

Formulas and assumptions

T = KDF
Use N of clamp force and meters of nominal bolt diameter to get N·m. The worksheet can invert the equation to estimate F from torque.
Fproof = Sproof Aₜ
Tensile stress area is π(D − cP)²/4. Use c = 0.938194 for metric and 0.9743 for Unified threads. P is pitch.
dᵈʳⁱˡˡ = D − (% thread)P / 76.98
This is a cut tap geometry estimate. Enter a candidate drill to see the achieved percentage of nominal thread height.

Engineering references

Frequently asked questions

How does the 3/4 in Grade 5 proof stress change above 1 in?

In the listed SAE J429 range, Grade 5 drops from 85 ksi to 74 ksi above 1 in. The worksheet applies the size band to the grade preset.

How do I calculate a total clamp load for several 3/4 in bolts?

Sum individual estimated clamp loads for an initial estimate. For joint design, evaluate stiffness, tightening sequence and preload scatter.