Worked example

Estimated clamp preload 12,800 lbf

  1. Convert 80 lbf·ft to 960 lbf·in. Divide by 0.15 × 0.5 in for estimated preload.
  2. Use the 20-TPI stress area with the Grade 8 proof stress of 120 ksi. Divide the estimated clamp load by that proof load to show the proof load fraction.

Before using this result. Verify the torque procedure and condition of bearing and mating surfaces. This worksheet assumes all applied torque is effective tightening torque.

Formulas and assumptions

T = KDF
Use N of clamp force and meters of nominal bolt diameter to get N·m. The worksheet can invert the equation to estimate F from torque.
Fproof = Sproof Aₜ
Tensile stress area is π(D − cP)²/4. Use c = 0.938194 for metric and 0.9743 for Unified threads. P is pitch.
dᵈʳⁱˡˡ = D − (% thread)P / 76.98
This is a cut tap geometry estimate. Enter a candidate drill to see the achieved percentage of nominal thread height.

Engineering references

Frequently asked questions

Why would a locknut change the 80 lbf·ft result?

Prevailing torque consumes part of the wrench reading before generating clamp load. Use an effective tightening torque that accounts for it.

Does a 1/2-13 bolt have the same proof load as this 1/2-20?

At the same proof stress, the coarser thread has a smaller tensile stress area. Change the pitch and check the proof load again.