Baseline reading

The three stations carry 333 seconds of work at a 120-second takt. Station 2 permits a modeled 244 units per shift.

What to test

Stress test the inspection cycle on heavy cabinet variants. Allow for safe handling and setup before committing the four-unit theoretical headroom.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Shift and demand
sec
sec
Observed workstation cycles
sec
sec
sec
sec
sec
sec

Results

Takt time
120 sec
Bottleneck station
Station 2
Bottleneck cycle
118 sec

Every entered station is at or below customer takt.

Yamazumi station balance
Yamazumi station balance Station cycle bars with the dashed takt threshold. Ochre identifies stations above takt. CUSTOMER TAKT 120 sec033.667.2100.8134.4Station 1110Station 2118Station 3105sec
Maximum steady-state shift output
244
Output minus demand
4
Net available shift time
28,800 sec
Total work content
333 sec
Theoretical station equivalents
2.775
Minimum whole stations
3
Line balance efficiency
94.0678%
Balance delay
5.9322%

Model notes

Use station times for one unit, with the same product and work method. Maximum output assumes a staffed, paced line in steady state and excludes start-up fill and starvation.

The minimum whole-station count is a workload bound. Precedence, indivisible tasks, tooling and travel can require more operators or stations.

View the equations

Frequently asked questions

Should two-person cabinet handling count as one station or two?

Enter the time between units for the station and track both assigned people for labor. Staffing inferred from work content assumes a consistent one-operator station unless adjusted separately.

Does 244 units include the first cabinet filling an empty line?