Worked example · Line balance
Label and pack line efficiency
Measure balance delay on a tightly paced six-station label and pack line with 600-unit shift demand.
Takt = Net available time ÷ Demand
Baseline reading
The line uses 247 of 258 available station-seconds per cycle at its 43-second pace. All six stations fit under the 44-second target.
What to test
Run the worksheet using realistic worst-case station averages from the busy mix. The nominal one-second bottleneck margin is sensitive to scan retries and replenishment.
Worksheet inputs
Inputs
Results
- Takt time
- 44 sec
- Bottleneck station
- Station 3
- Bottleneck cycle
- 43 sec
- Maximum steady-state shift output
- 613
- Output minus demand
- 13
- Net available shift time
- 26,400 sec
- Total work content
- 247 sec
- Theoretical station equivalents
- 5.61364
- Minimum whole stations
- 6
- Line balance efficiency
- 95.7364%
- Balance delay
- 4.2636%
Model notes
Use station times for one unit, with the same product and work method. Maximum output assumes a staffed, paced line in steady state and excludes start-up fill and starvation.
The minimum whole-station count is a workload bound. Precedence, indivisible tasks, tooling and travel can require more operators or stations.
Frequently asked questions
Does high packing balance efficiency imply plenty of delivery margin?
The numbers answer different questions. This line is balanced at its current cycle and still has only one second between its slowest station and takt.
How should label roll replacement be time-studied?
Log its frequency and duration. Treat predictable line-wide stoppage as scheduled loss or model an effective per-unit time, using a consistent method across scenarios.