Worked example · Equipment effectiveness
Laser cutting shift OEE
Reconcile laser cell availability with nozzle changeouts, nesting interruptions, slower cutting, and part rejects.
OEE = Availability × Performance × Quality
Baseline reading
The cell was available for 330 minutes, while the 400 started parts represented 300 ideal minutes. This leaves a 30-minute speed-loss budget.
What to test
Split nozzle failures from program setup in the downtime log. If the part mix changes, calculate ideal time by product or nest before comparing shifts.
Worksheet inputs
Inputs
Results
- Overall equipment effectiveness
- 68.2143%
- Total effective equipment performance
- 19.8958%
- Availability
- 78.5714%
- Performance
- 90.9091%
- Quality
- 95.5%
- Calendar utilization
- 29.1667%
- Run time
- 330 min
- First-pass good parts
- 382
- Ideal planned output
- 560 units
- Lost to downtime
- 120 units
- Lost to slow cycles and minor stops
- 40 units
- Lost to scrap or rework
- 18 units
- Unplanned stop loss
- 93.33 units
- Setup and adjustment loss
- 26.67 units
- Minor-stop loss
- 13.33 units
- Reduced-speed loss
- 26.67 units
- Production rejects
- 15
- Startup rejects
- 3
Model notes
Count each first-pass reject once. Use the ideal rate for the product being run and reconcile shift counts against the same production window.
The waterfall translates time losses into good-unit equivalents. Once stops and speed losses are removed, each rejected part reduces first-pass good output by one unit.
Frequently asked questions
Can I count laser nests instead of individual cut parts?
Yes, if each count represents a comparable nest and the ideal time and reject tally use that same unit. Use a weighted ideal time for dissimilar nests.
How should edge-oxide rework affect first-pass laser quality?
Flag the affected parts as first-pass rejects at the cut quality gate even if they later pass a separate rework operation.