Worked example · Equipment effectiveness
Weekend machine calendar TEEP
Compare scheduled-shift OEE with seven-day TEEP for a weekend machining schedule.
OEE = Availability × Performance × Quality
Baseline reading
The 3,360 accepted parts represent 28 fully productive hours. The calendar window is 168 hours, giving 16.67% TEEP.
What to test
Hold downtime and speed assumptions steady while testing a larger schedule. Use customer demand and staffing constraints to judge whether the available calendar capacity is worth using.
Worksheet inputs
Inputs
Results
- Overall equipment effectiveness
- 77.7778%
- Total effective equipment performance
- 16.6667%
- Availability
- 88.8889%
- Performance
- 88.5417%
- Quality
- 98.8235%
- Calendar utilization
- 21.4286%
- Run time
- 1,920 min
- First-pass good parts
- 3,360
- Ideal planned output
- 4,320 units
- Lost to downtime
- 480 units
- Lost to slow cycles and minor stops
- 440 units
- Lost to scrap or rework
- 40 units
- Unplanned stop loss
- 360 units
- Setup and adjustment loss
- 120 units
- Minor-stop loss
- 80 units
- Reduced-speed loss
- 360 units
- Production rejects
- 32
- Startup rejects
- 8
Model notes
Count each first-pass reject once. Use the ideal rate for the product being run and reconcile shift counts against the same production window.
The waterfall translates time losses into good-unit equivalents. Once stops and speed losses are removed, each rejected part reduces first-pass good output by one unit.
Frequently asked questions
Should a holiday be removed from a weekly 24/7 TEEP denominator?
Keep it in the full seven-day calendar. Record the holiday as unscheduled time unless the equipment was intended to produce.
Can a weekend maintenance window depress both OEE and TEEP?
An outage within the scheduled window reduces OEE and TEEP. Maintenance outside that window still occupies calendar capacity, while scheduled-shift OEE uses the remaining planned window.