FactoryOEELab

Worked example · Equipment effectiveness

Weekend machine calendar TEEP

Compare scheduled-shift OEE with seven-day TEEP for a weekend machining schedule.

OEE = Availability × Performance × Quality

Baseline reading

The 3,360 accepted parts represent 28 fully productive hours. The calendar window is 168 hours, giving 16.67% TEEP.

What to test

Hold downtime and speed assumptions steady while testing a larger schedule. Use customer demand and staffing constraints to judge whether the available calendar capacity is worth using.

Currency labels entered amounts. Exports record the selected display units.

Inputs

Production window
min
min
min
min

Include all hours in the same period. Use 24 hours for one calendar day.

Production counts
min
Loss detail
min

Use the stop threshold in your plant reporting policy.

Results

Overall equipment effectiveness
77.7778%
Total effective equipment performance
16.6667%
Availability
88.8889%
Good-unit waterfall and APQ factors
Good-unit waterfall and APQ factors Waterfall from ideal production to first-pass good parts, followed by availability, performance, and quality factor bars. IDEAL GOOD-UNIT EQUIVALENTS4.3KIdeal480Stops440Speed40Rejects3.4KGoodAvailability88.9%Performance88.5%Quality98.8%
Performance
88.5417%
Quality
98.8235%
Calendar utilization
21.4286%
Run time
1,920 min
First-pass good parts
3,360
Ideal planned output
4,320 units
Lost to downtime
480 units
Lost to slow cycles and minor stops
440 units
Lost to scrap or rework
40 units
Unplanned stop loss
360 units
Setup and adjustment loss
120 units
Minor-stop loss
80 units
Reduced-speed loss
360 units
Production rejects
32
Startup rejects
8

Model notes

Count each first-pass reject once. Use the ideal rate for the product being run and reconcile shift counts against the same production window.

The waterfall translates time losses into good-unit equivalents. Once stops and speed losses are removed, each rejected part reduces first-pass good output by one unit.

View the equations

Frequently asked questions

Should a holiday be removed from a weekly 24/7 TEEP denominator?

Keep it in the full seven-day calendar. Record the holiday as unscheduled time unless the equipment was intended to produce.

Can a weekend maintenance window depress both OEE and TEEP?

An outage within the scheduled window reduces OEE and TEEP. Maintenance outside that window still occupies calendar capacity, while scheduled-shift OEE uses the remaining planned window.