NFPA 20 · Worked example
Pressure maintenance versus one open head
An existing aboveground loop is estimated to lose 14 GPM. The small sprinkler selected for comparison flows 12 GPM.
Inputs
Three-point fire pump curve
Edit inputsFor aboveground leakage service, review whether the jockey pump could mask an opened sprinkler.
How to read this example
The pressure-maintenance estimate reaches the single-sprinkler flow. Investigate leakage and verify that sprinkler operation will start the main pump.
Open the base calculatorCalculated values
- Churn · percent of rated pressure
- 127.1 %
- 150% flow · percent of rated pressure
- 75.3 %
- 150% test flow
- 750 GPM
- Reserve below 140% ceiling
- 12.9 pp
- Reserve above 65% floor
- 10.3 pp
- Flowing suction reserve
- 20 psi
- Rated water power
- 24.8 hp
- 150% water power
- 28 hp
- Rated shaft load
- 34.44 hp
- 150% shaft load
- 41.8 hp
- Electric mechanical power estimate
- 58 hp
- Diesel pre-derating power estimate
- 64.44 hp
- Pressure maintenance flow estimate
- 14 GPM
- Jockey discharge target
- 146 psi
Equations and assumptions
Churn ≤ 140% of rated net pressureP_150 ≥ 65% of rated net pressureWater hp = Q ΔP / 1714BHP = water hp / pump efficiency
Enter net pump pressures at churn, rated flow and 150% flow. Use the listed full-curve peak BHP and the manufacturer’s site derating and driver data for selection.
The suction field screens a measured gauge pressure against the entered minimum. Confirm the adopted standard, the supply type, its available flow, intake arrangement and pump suction limits.
The jockey estimate uses at least 1 GPM or the entered leakage rate and aims for churn net pressure plus static suction. Compare with one sprinkler flow for aboveground-only pressure maintenance.