A feed–effluent train uses two ideal shell passes. The warmed feed leaves above the effluent outlet temperature.

Terminal temperature profile

Q = U × A × Fₜ × ΔTₗₘ

Edit inputs ↓
Area needed
79.574m²
LMTD
64.343K
Fₜ factor
0.94811
Rated duty
3,298.8kW
Terminal temperature profile160 °C95 °C101 °C25 °CHOT STREAM →← COLD STREAMEnd AEnd BFₜ 00.75 screenFₜ 1
The lines join terminal temperatures along the hot-stream direction. Shell cases use a counterflow reference for the temperature plot.
  • Cold outlet meets or exceeds hot outlet. Check the terminal approaches and the selected flow arrangement.

Inputs

°C
°C
°C
°C
kW
W/(m²·K)
m²

Calculated results

Required surface
79.574 m²
Log mean ΔT
64.343 K
Correction factor Fₜ
0.94811
Available duty
3,298.8 kW
Target duty
2,500 kW
Corrected mean ΔT
61.005 K
Terminal difference A
59 K
Terminal difference B
70 K
Cold temperature ratio P
0.56296
Stream temperature ratio R
0.85526
Duty reserve vs. target
31.953 %

Worked solution

Preset calculation · Metric SI

  1. Pair the terminal temperatures to obtain 59 K and 70 K. Their log mean is 64.343 K.
  2. Use P = 0.56296 and R = 0.85526 for the shell correction where applicable. Fₜ = 0.94811.
  3. Divide 2,500 kW by 515 W/(m²·K) times the corrected drive of 61.005 K to obtain 79.574 m².

Check the outlet cross and the positive terminal gaps. Compare the 2–4 correction factor to the 1–2 case at the same temperatures.

Calculation basis

Enter four terminal temperatures, a target duty, and a service U. Required surface meets the target duty at the specified conditions. Available duty rates the entered surface at those same conditions.

The two terminal differences define ΔTₗₘ. Equal terminal differences give that exact difference. Parallel and counterflow use Fₜ = 1 with their own terminal pairing.

For ideal 1–2 and 2–4 shell arrangements, Fₜ corrects the counterflow mean using Bowman–Mueller–Nagle P and R. Fₜ below 0.75 warrants a layout review. Terminal temperatures must also lie inside the feasible Fₜ domain.