CO₂ fill time for a 21.6 m³ greenhouse at 1,000 ppm

A 3×3×2.4 m space starts at 420 ppm and evaluates a 1,000 ppm target with 0.6 air changes per hour. The supply setting is 2 L/min.

Inputs

Growing space and concentration
m
m
m
ppm
ppm
ACH

Zero is the ideal sealed-room calculation only.

Supply and operating schedule
L/min
kg

Enter the gas mass, such as 20 lb or 50 lb.

min
h/day

Results

Cylinder runtime at full flow

41.31 hours

Ideal-gas estimate near 20 °C and 1 atm

Room volume
21.6 m³
Ideal no-exchange fill gas
12.528 L
Initial fill time at supply flow
6.47 min
Average flow to offset air exchange
0.125 L/min
Average holding duty
6.26 %
Equivalent on-time per cycle
0.75 min
Ideal fills per cylinder
395
Estimated cylinder life with daily refill
56.79 days

Ideal fill profile

The curve assumes well-mixed air and constant exchange.

Modeled CO₂ concentration rampIdeal well-mixed fill profile. The dashed line represents the planning target.CO₂ · ppm1000420010 min

Worked calculation

  1. Convert the ppm increase to an ideal fill volume

    21,600 L × 580 ÷ 1,000,000 = 12.528 L

  2. Calculate the air-exchange replacement flow

    12.528 L × 0.6 ACH ÷ 60 = 0.1253 L/min

  3. Estimate the time to reach target from baseline

    −ln(1 − holding flow ÷ supply flow) ÷ (ACH ÷ 60) = 6.469 min

  4. Estimate cylinder gas volume and full-flow runtime

    9.07 kg = 9.0718 kg. Gas volume = 4,957.3 L. Divide by supply L/min and 60 = 41.31 h.

What the example shows

The no-exchange fill equivalent is 12.53 L. Accounting for the stated exchange gives an ideal ramp of about 6.47 minutes. Use concentration feedback to evaluate a real installation.

How the model works

The room is modeled as well mixed, with constant incoming concentration and air exchange. Gas density is 1.83 g/L near 20 °C and 1 atm. Plant uptake, poor mixing, active ventilation changes and regulator behavior alter the result.

Equivalent timer on-time describes a cycle average. Peaks and troughs depend on cycle length, mixing, sensor placement and control response. Use a monitored controller supported by ventilation and independent safety alarms.

References

Common questions

Why is the calculated metric fill time longer than 12.53 L divided by 2 L/min?

Some of the added gas is removed with the exchanged air during the ramp. The model accounts for that loss as concentration rises.

Which cylinder weight goes in the metric capacity field?

Enter the labeled gas charge in kilograms. The container tare weight or the gross filled cylinder weight would overstate available gas.