Point-source estimate · IAEA SSG-11
Cs-137 with two steel HVLs
The source and a 60 mm steel path illustrate the exponentially decreasing gamma component.
Reading the result. A thickness twice the 30 mm first-HVL reference models a 75% reduction. The rate target remains a comparison level.
Setup
Source and shielding
GBq
mm
×
1 = no reduction. Use a directional factor.
Distance and shift
m
mSv/h
min
mSv
mSv
Results update as you edit. Use calibrated measurements.
Inspection readout
SI units- Bare rate
- 0.34299mSv/h
- Shielded rate
- 0.021437mSv/h
- Model radius
- 1.4641m
- Shift dose
- 0.010716mSv
Within modeled targets
Field barricades require an approved radiation protection plan and calibrated survey measurements.
- Gamma-rate coefficient Γ
- 0.0927mSv·m²/h/GBq
- Half-value layer
- 30mm
- Tenth-value layer
- 69mm
- HVL transmission
- 25%
- TVL transmission
- 13.503%
- Rate comparison level
- 1mSv/h
- Dose per shot at work distance
- 0.00071456mSv
- Shift planning check
- At or below planning level
Planning model only. Field barricades require an approved radiation protection plan, qualified oversight and calibrated surveys. Scattering, leakage, buildup and beam direction can change the actual boundary. Equations and references