Point-source estimate · IAEA SSG-11
Co-60 through one concrete TVL
A concrete barrier is modeled at the representative 245 mm Co-60 first TVL.
Reading the result. One TVL gives 10% transmission in the TVL model. The HVL model can differ because the source table reports separate layer values.
Setup
Source and shielding
GBq
mm
×
1 = no reduction. Use a directional factor.
Distance and shift
m
mSv/h
min
mSv
mSv
Results update as you edit. Use calibrated measurements.
Inspection readout
SI units- Bare rate
- 9.0278mSv/h
- Shielded rate
- 0.90278mSv/h
- Model radius
- 80.623m
- Shift dose
- 0.24574mSv
Modeled rate exceeds target
The point-source model predicts a higher rate at the selected work distance.
- Gamma-rate coefficient Γ
- 0.35135mSv·m²/h/GBq
- Half-value layer
- 62mm
- Tenth-value layer
- 245mm
- HVL transmission
- 6.4632%
- TVL transmission
- 10%
- Rate comparison level
- 0.02mSv/h
- Dose per shot at work distance
- 0.030093mSv
- Shift planning check
- Exceeds planning level
Planning model only. Field barricades require an approved radiation protection plan, qualified oversight and calibrated surveys. Scattering, leakage, buildup and beam direction can change the actual boundary. Equations and references