Point-source estimate · IAEA SSG-11

Co-60 through one concrete TVL

A concrete barrier is modeled at the representative 245 mm Co-60 first TVL.

Reading the result. One TVL gives 10% transmission in the TVL model. The HVL model can differ because the source table reports separate layer values.

Setup

Source and shielding

GBq
mm
×
1 = no reduction. Use a directional factor.

Distance and shift

m
min
mSv
mSv
Worked examples

Results update as you edit. Use calibrated measurements.

Inspection readout

SI units
Bare rate
9.0278mSv/h
Shielded rate
0.90278mSv/h
Model radius
80.623m
Shift dose
0.24574mSv
Modeled rate exceeds target

The point-source model predicts a higher rate at the selected work distance.

Modeled boundary and attenuationRings compare the selected work distance with the model radius. The attenuation plot uses a logarithmic transmission axis.Gamma field modelLog transmissionWork distance / model radius0.14884×Model ringWork pointHVL / TVL
Rings compare the selected work distance with the model radius. The attenuation plot uses a logarithmic transmission axis.
Gamma-rate coefficient Γ
0.35135mSv·m²/h/GBq
Half-value layer
62mm
Tenth-value layer
245mm
HVL transmission
6.4632%
TVL transmission
10%
Rate comparison level
0.02mSv/h
Dose per shot at work distance
0.030093mSv
Shift planning check
Exceeds planning level

Planning model only. Field barricades require an approved radiation protection plan, qualified oversight and calibrated surveys. Scattering, leakage, buildup and beam direction can change the actual boundary. Equations and references