ASME V Article 4 · ISO 10863

Bottom-tip pick near the backwall

A 30 mm wall with 60 mm PCS has a backwall near 4.142 µs relative to lateral. The bottom pick occurs at 4.13 µs.

Reading the result. The depth calculation remains in range. The pulse-width comparison flags potential overlap with the backwall response.

Setup

Probe geometry

mm
mm
°
PCS target places crossing at ⅔ thickness.
m/s

Arrival time picks

µs
µs
µs
µs
0 uses one sample as a lower bound.
Worked examples

Results update as you edit. Use calibrated measurements.

Inspection readout

SI units
Top tip depth
9.6047mm
Bot. tip depth
29.948mm
Flaw height
20.344mm
Lateral zone
4.6615mm
Bottom tip close to backwall

A pulse-width interval also overlaps the backwall neighborhood. Confirm separation with the setup waveform.

Probe pair and TOFD arrivalsThe cross-section shows the midline flaw model. The timing sketch traces lateral, tip and backwall arrivals as a scan passes the flaw.Pitch-catch setupTime tracesLateral → backwall3.63 µs apartLateralTip pathsBackwall
The cross-section shows the midline flaw model. The timing sketch traces lateral, tip and backwall arrivals as a scan passes the flaw.
PCS target at ⅔ wall
69.282mm
Lateral arrival in chosen datum
0µs
Lateral material travel time
10µs
Backwall arrival in chosen datum
4.1421µs
Backwall material travel time
14.142µs
Two-wedge delay
—
Tip-pick separation
3.63µs
Modeled obscuring interval
0.12µs
Depth change per sample at top tip
0.19499mm

Use a calibrated material velocity, actual probe index separation and measured pulse duration. Off-midline reflectors, wedges and wave overlap require a qualified TOFD setup. Equations and references