Worked example

Chow M1 backwater behind a dam

An idealized dam backs Chow’s 400 cfs trapezoidal channel up to 5 ft. Trace the profile toward 3.4 ft using α = 1.10.

Results ↓

Inputs

Channel section
cfs
ft
Enter 0 for a triangular section. Set side slope to 0 for a rectangle.
Use a positive slope for falling bed, zero for level or a negative value for adverse slope.
Profile controls
ft
ft
ft
ft
Use 1 for uniform section velocity.

Hydraulic readout

M1 · Upstream profile

Reach distance: 2,342.03 ft, Normal depth: 3.36107 ft, Critical depth: 2.2125 ft, Min. freeboard: 1 ft

Gradually varied water-surface profileThe direct-step stations are plotted with the channel bed, critical depth and normal depth where defined. The second chart compares depth and available freeboard.REACH DISTANCE2,342 ftNORMAL DEPTH3.3611 ftCRITICAL DEPTH2.2125 ftMIN. FREEBOARD1 ftWater surface · downstream →WaterNormal yₙCrit. y꜀Channel depth & freeboardDepthLimitBankAvailable freeboard1 ft / 0.5 ft
  • Twenty equal depth steps. Station x increases downstream. Check sensitivity to step size near normal depth and evaluate transitions separately.

Calculation details

Profile type
M1
Bed slope class
Mild
Direction
Upstream
Target station
-2,342.03 ft
Required freeboard
0.5 ft

Direct-step station schedule

StationftDepthftVelocityft/sFroudeFriction slope
052.66670.242773.7295e-4
-61.4294.922.72460.249723.9613e-4
-123.844.842.78450.256964.2111e-4
-187.354.762.84670.264534.4808e-4
-252.114.682.91110.272444.7722e-4
-318.34.62.9780.280715.0875e-4
-386.124.523.04740.289375.4291e-4
-455.834.443.11950.298445.7997e-4
-527.754.363.19440.307946.2022e-4
-602.274.283.27230.317916.6401e-4
-679.914.23.35350.328387.1171e-4
-761.314.123.43790.339387.6376e-4
-847.374.043.5260.350968.2064e-4
-939.33.963.61780.363148.829e-4
-1,038.83.883.71370.375989.5117e-4
-1,148.63.83.81390.389530.0010262
-1,272.83.723.91860.403840.0011087
-1,418.93.644.02820.418960.0011997
-1,601.63.564.14310.434980.0013002
-1,858.43.484.26340.451950.0014115
-2,3423.44.38980.469950.001535

Interpreting this example

The signed target station is upstream. Chow used a coarser, rounded station table, so the 20-step calculation gives a slightly different reach length.

Δx = (E₂ − E₁)/(S₀ − S̄f) · E = y + α V²/(2g)

Each step averages the friction slope at its endpoints. Normal depth is an asymptote and may not lie in the requested interval. Critical depth can be a boundary at a control. The energy coefficient also enters the energy-minimum depth.

Steady, one-dimensional flow in a prismatic channel is assumed. Use a finer or adaptive calculation near normal depth and a separate model for rapid changes.

Worked examples

Open a case to load its inputs and interpretation.

All cases →

Share worksheet