ABS enclosure on two cooling circuits

A 3 mm amorphous ABS enclosure cools on two equal-flow water circuits.

Edit inputs ↓

Inputs

Part and mold
mm
mm²/s
°C
°C
°C
Heat per cycle
kg
s
kJ/(kg·K)
kJ/kg
Use zero for an amorphous resin or include crystallization heat if known.
Coolant circuit
mm
°C
kJ/(kg·K)
kg/L
mPa·s
Review calculations ↑
Cooling time
13.02s
Heat load
2.24kW
Coolant flow
10.73L/min
Channel Re
17,736

Slab-center cooling and water circuit

Live schematic
SLAB CENTERWATER CHANNELS13.02 sØ 8 mmMelt 235 °CEject 94 °C

Turbulent channel flow

Re 04,000 target6,000+

Turbulence screen uses Re ≥ 4,000 per equal-flow branch. Compare the slab cooling estimate with the total cycle separately.

Calculation details
Refrigeration equivalent0.64 TR
Resin enthalpy removed260.85 kJ/kg
Heat removed per shot62.6 kJ
Flow per parallel circuit5.37 L/min
Channel mean velocity1.78 m/s
Cycle time minus cooling14.98 s
Re margin above 4,00013,736

Working through the example

Size the heat removal from the full shot. Split total flow across both circuits for the Reynolds check.

t_c = [s²/(π²α)] ln[(4/π)(Tₘ−T𝓌)/(Tₑ−T𝓌)]. Heat (kW) = m_shot[cₚ(Tₘ−Tₑ) + ΔH_f]/t_cycle.

The slab starts at uniform melt temperature, with constant diffusivity and two surfaces held at the entered wall temperature. The first Fourier term estimates when the center reaches the ejection temperature. The plot caps that approximation at melt temperature near time zero. Water flow is from the steady heat balance. Divide it across equal branches and calculate Re = ρuD/μ, screened at 4,000. Chiller selection also depends on site loads, distribution loss and equipment margin.

Methodology and sources