36 V boost at light load

A 22 µH inductor is already installed. Test the stage at an 80 mA output load.

Design inputs

Operating point
Inductor & output capacitor

Peak-to-peak ripple divided by average current in CCM.

Enter 0 to use the calculated inductance.

View live readout ↑

Live readout

Edit inputs
Target L
1,217 µH
Ripple ΔI
0.7435 A
Peak Iₗ
0.7435 A
Ripple ΔV
33.93 mV
Inductor current Inductor current 5.56 µs / period Iₗ0Switching cycle →Peak current0.743 ARipple ΔI0.743 ARegionDCM
The trace follows the selected inductor. The idle interval opens when coil current reaches zero before the next cycle.
Discontinuous conduction

Output ripple is within the entered goal.

CCM boundary / load0.664 A / 0.08 A

Output ripple / goal33.93 mV / 150 mV

Result breakdown
Inductance at target ripple1,217.27 µH
Inductance used in readout22 µH
Continuous-conduction duty38 %
Operating duty13.1904 %
Conduction modeDCM
Average inductor current0.129032 A
Valley inductor current0 A
Peak inductor current0.743456 A
RMS inductor current0.25289 A
Peak-to-peak inductor ripple0.743456 A
Critical output load0.663964 A
Capacitive ripple16.0882 mV
ESR ripple17.843 mV
Combined ripple estimate33.9312 mV
Minimum capacitance at ripple goal2.67819 µF

Worked calculation

Veff = 93% × 24 V = 22.32 V → L at target ripple = 1,217.27 µH

Find the idle interval in the trace. Raise the load past the displayed critical load and watch it disappear.

Duty & inductor

Veff = η · Vin | L = Von · D / (fs · ΔIL)

Efficiency is represented by an effective input voltage ahead of an ideal switching stage. Duty is Vout/Veff for buck, 1 − Veff/Vout for boost, and Vout/(Veff + Vout) for the inverting topology. Output magnitude is positive for all three cases.

Boundary & current

Icrit = (ΔIL,CCM / 2) · k | k = 1 (buck), 1 − D (boost / inverting)

At the boundary, the valley inductor current is zero. Below it, the model solves on-time and off-time from the two current slopes and load charge balance. For CCM the RMS value is √(Iavg² + ΔIL²/12).

Ripple budget

ΔVpp ≈ Qpositive / Cout + ESR · ΔIcap