5- vs 6-inch K-style gutter on a short eave
A 32 ft eave handles 1,200 ft² of 6:12 roof at 6 in/hr, with one large round outlet in the initial layout.
Worked calculation
The sizing flow is about 82.3 gal/min. Under the reference assumptions, one outlet and one 6-inch K-style reach meet the screen.
Change the inputs to test your own measurements. Reset restores this example.
Results
LiveCorrect the highlighted inputs to update your results.
- Estimated gutter width
- Downspouts for selected layout
- Adjusted drainage area
- Pitch allowance
- Peak runoff from projected area
- Peak runoff, alternate units
- Sizing flow with pitch allowance
- Sizing flow per outlet
- Average eave length per outlet
- 5 in / 127 mm reference
- 6 in / 152 mm reference
- Selected outlet assembly capacity
- 2 × 3 in / 51 × 76 mm leader minimum
- 3 × 4 in / 76 × 102 mm leader minimum
- 4 in / 102 mm round leader minimum
Worksheet inputs US customary
- Projected area draining to this gutter
- 1,200 ft²
- Contributing roof pitch
- 6:12
- Peak rainfall intensity
- 6 in/hr
- Continuous eave run
- 32 ft
- Maximum length served per outlet
- 35 ft
- Gutter profile
- K-style
- Downspout profile
- 4 in round
- 5 in / 127 mm gutter capacity
- 0 US gal/min
- 6 in / 152 mm gutter capacity
- 0 US gal/min
- Selected outlet assembly capacity
- 0 US gal/min
Apply this example to your roof
Half-round defaults use the 2021 IPC semicircular reference at 1/8 in/ft. K-style defaults of 60 and 90 gal/min and leader assembly defaults of 30, 60 and 90 gal/min are screening assumptions. Replace them with documented ratings for your slope, outlets and profiles. Check concentrated valley flow, walls that contribute runoff and overflow paths.
Frequently asked questions
Why does the short K-style eave screen at 6 inches?
Its adjusted flow is above the 5-inch planning assumption of 60 gal/min and below the 6-inch assumption of 90 gal/min.
What would a second outlet change on the short eave?
If both reaches get equal area, each would handle about 41 gal/min. Check the actual catchment split before sizing the gutter.