One eave receives 900 ft² of projected roof at 4:12. A 4 in/hr storm and a 36 ft run drive the first downspout estimate.

Worked calculation

Use the area contributing to this one eave. The projected flow is about 37.4 gal/min. With the pitch allowance and outlet limits, two downspouts serve the reach.

Change the inputs to test your own measurements. Reset restores this example.

Inputs

Units
Contributing roof and storm
ft²
:12
Gutter and outlets
ft
ft
Capacity overrides
US gal/min Zero uses the profile’s reference capacity.
US gal/min Enter the manufacturer’s flow for your actual slope and run.
US gal/min Zero uses the screening value for the selected profile.

Results

Live

Gutter reaches and downspout flowEstimated gutter width 5 in. Downspouts for selected layout 2. K-STYLE GUTTER5 in nominal2 downspouts19.64 US gal/min each18 ft eave length per outlet
Gutter reaches and downspout flow Schematic
Adjusted drainage area
945 ft²
Pitch allowance
1.05×
Peak runoff from projected area
37.4 US gal/min
Peak runoff, alternate units
0.0833 ft³/s
Sizing flow with pitch allowance
39.27 US gal/min
Sizing flow per outlet
19.64 US gal/min
Average eave length per outlet
18 ft
5 in / 127 mm reference
60 US gal/min
6 in / 152 mm reference
90 US gal/min
Selected outlet assembly capacity
30 US gal/min
2 × 3 in / 51 × 76 mm leader minimum
2
3 × 4 in / 76 × 102 mm leader minimum
2
4 in / 102 mm round leader minimum
2

Apply this example to your roof

Half-round defaults use the 2021 IPC semicircular reference at 1/8 in/ft. K-style defaults of 60 and 90 gal/min and leader assembly defaults of 30, 60 and 90 gal/min are screening assumptions. Replace them with documented ratings for your slope, outlets and profiles. Check concentrated valley flow, walls that contribute runoff and overflow paths.

Read the calculator method and references

Frequently asked questions

Should both halves of the 900 ft² gable example enter one eave?

Enter the half that drains to this eave. Evaluate the opposite half separately unless it drains to the same gutter.

What drives the two outlet estimate on the 36-foot run?

Both the 35 ft service limit and the 30 gal/min screening outlet capacity require two outlets here.