Eighth-inch taper for a long drainage run

A 2,200 ft² drainage zone has a 36 ft run and tight flashing clearance. Compare a 1/8 in/ft taper on a flat deck.

Worked calculation

A 36 ft run gains 4.5 inches, giving a 6-inch thick end. The net slope remains 1/8 in/ft, below the tool’s drainage screen.

Change the inputs to test your own measurements. Reset restores this example.

Inputs

Units
Drainage zone
ft²
ft
in/ft Use a negative value when the deck falls away from the drain.
in
Optional diamond cricket
ft Set the length to zero to omit the cricket.

Results

Live

Tapered insulation section and cricketThick end of main taper 6 in. Total insulation volume 8,250 board ft. INSULATION SECTION8,250 board ft totalThick 6 inDrain 1.5 inRun 36 ftNet slope 0.13 in/ft
Tapered insulation section and cricket Schematic
Insulation rise
4.5 in
Net surface slope toward drain
0.13 in/ft
Net surface fall to drain
4.5 in
Average main-taper thickness
3.75 in
Thermal resistance per thickness
5.7 R/in
Thin-end insulation R-value
8.55 h·ft²·°F/Btu
Arithmetic average insulation R-value
21.38 h·ft²·°F/Btu
Idealized effective insulation R-value
18.5 h·ft²·°F/Btu
Main taper volume
8,250 board ft
Cricket projected area
0 ft²
Cricket add-on peak rise
0 in
Cricket add-on volume
0 board ft
  • The net slope is below the 1/4 in/ft screening target. Check deck deflection, drain levels and the roof system’s drainage requirements.

Apply this example to your roof

Verify roof assembly slope and thermal requirements, low spots, flashing clearance, tapered board layouts and secondary drainage. The R-value is for the modeled insulation. The arithmetic average does not describe the thin-end R-value.

Read the calculator method and references

Frequently asked questions

How does the eighth-inch taper help with flashing clearance?

It cuts the required rise over the same run compared with a steeper taper. Check whether the remaining slope and detailing work for the roof assembly.

Can the 36-foot drainage run be shortened?

A relocated or additional drain may shorten the longest run. Recheck drain capacity, overflow provisions and the layout as a whole.