Quarter-inch polyiso taper across 24 ft
A 1,600 ft² flat deck drains over 24 ft with a 1/4 in/ft taper, 2 inches at the drain and a small diamond cricket.
Worked calculation
The main field rises 6 inches, from 2 to 8. Its average is 5 inches for 8,000 board ft, with a further 18 board ft from the cricket.
Change the inputs to test your own measurements. Reset restores this example.
Results
LiveCorrect the highlighted inputs to update your results.
- Thick end of main taper
- Total insulation volume
- Insulation rise
- Net surface slope toward drain
- Net surface fall to drain
- Average main-taper thickness
- Thermal resistance per thickness
- Thin-end insulation R-value
- Arithmetic average insulation R-value
- Idealized effective insulation R-value
- Main taper volume
- Cricket projected area
- Cricket add-on peak rise
- Cricket add-on volume
- Cricket center-to-tip ridge slope
Worksheet inputs US customary
- Horizontal drainage zone area
- 1,600 ft²
- Horizontal run to drain
- 24 ft
- Tapered board slope
- 1/4 in/ft
- Existing deck slope to drain
- 0 in/ft
- Thin insulation at drain
- 2 in
- Insulation board
- Polyiso · nominal
- Cricket tip-to-tip length
- 12 ft
- Cricket full width
- 6 ft
- Cricket cross-slope
- 0.5 in/ft
Apply this example to your roof
Verify roof assembly slope and thermal requirements, low spots, flashing clearance, tapered board layouts and secondary drainage. The R-value is for the modeled insulation. The arithmetic average does not describe the thin-end R-value.
Frequently asked questions
How high does the quarter-inch taper get over 24 feet?
It adds 6 inches to the 2-inch drain thickness, putting the thick end at 8 inches.
Why is the cricket volume added to the polyiso field volume?