Worked example · Controls & protection

Riprap apron under higher tailwater

A downstream ditch normally covers more than half the culvert diameter during the evaluated storm.

Inputs

Culvert outfall
0–1,500 cfs
6–144 in
0–20 ft

For unknown tailwater enter zero. The HEC-14 minimum is applied automatically.

Stone and placement
0–60 in
2–4
40–200 lb/ft³

Use in-place bulk density, including voids, for material tonnage.

Riprap apron plan

Live results
Riprap apron plan Available stone meets D₅₀. Higher tailwater (TW ≥ 0.5Dₒ). Example class dimensions use the next qualifying size. REQUIRED D₅₀ 2.07 in APRON LENGTH 10.67 ft FLARED WIDTH 15.11 ft PLACED MASS 9.71 US ton Circular outletHigher tailwaterW₂Lₐ · 10.67 ft 0Required D₅₀2× required

Available stone meets D₅₀

Higher tailwater (TW ≥ 0.5Dₒ). Example class dimensions use the next qualifying size.

Calculation results

Required D₅₀
2.07 in
Apron length
10.67 ft
Flared width
15.11 ft
Placed mass
9.71 US ton
Example class D₅₀
5 in
Apron thickness
17.5 in
Upstream apron width
8 ft
Placed volume
179.75 ft³
Available stone reserve
3.93 in
Tailwater used
1.8 ft
Effective diameter
2.67 ft
Actual TW / Dₒ
0.675

Worked calculation

The available rock can be screened against the continuous D₅₀ result while the apron dimensions use the next table class.

D₅₀ = 0.2 D[Q/(√g D⁵ᐟ²)]⁴ᐟ³(D/TW) · W₂ = 3Dₒ + 2Lₐ/3 · mass = placed volume × bulk density.

HEC-14 Eq. 10.4 limits tailwater to 0.4–1.0 effective diameters. USDA classifies site tailwater at 0.5 outlet diameters. For supercritical flow, the effective diameter is the mean of outlet diameter and normal depth. Apron dimensions follow the next qualifying example class in HEC-14 Table 10.1 with a 1:3 flare per side. Larger sizes or tailwater beyond the equation range need site-specific outlet protection analysis.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.