Worked example · Controls & protection

Stockpiled stone smaller than the requirement

A roadside maintenance yard has 6 in median stone available for a concentrated outfall.

Inputs

Culvert outfall
0–1,500 cfs
6–144 in
0–20 ft

For unknown tailwater enter zero. The HEC-14 minimum is applied automatically.

Stone and placement
0–60 in
2–4
40–200 lb/ft³

Use in-place bulk density, including voids, for material tonnage.

Riprap apron plan

Live results
Riprap apron plan Available stone is too small. Low tailwater (TW < 0.5Dₒ). Example class dimensions use the next qualifying size. REQUIRED D₅₀ 6.81 in APRON LENGTH 12.5 ft FLARED WIDTH 15.83 ft PLACED MASS 15.46 US ton Circular outletLow tailwaterW₂Lₐ · 12.5 ft 0Required D₅₀2× required

Available stone is too small

Low tailwater (TW < 0.5Dₒ). Example class dimensions use the next qualifying size.

Calculation results

Required D₅₀
6.81 in
Apron length
12.5 ft
Flared width
15.83 ft
Placed mass
15.46 US ton
Example class D₅₀
10 in
Apron thickness
24 in
Upstream apron width
7.5 ft
Placed volume
291.67 ft³
Available stone reserve
-0.81 in
Tailwater used
1 ft
Effective diameter
2.5 ft
Actual TW / Dₒ
0.4

Worked calculation

Compare the stockpile against the continuous hydraulic requirement. A larger qualifying class may also change apron length and thickness.

D₅₀ = 0.2 D[Q/(√g D⁵ᐟ²)]⁴ᐟ³(D/TW) · W₂ = 3Dₒ + 2Lₐ/3 · mass = placed volume × bulk density.

HEC-14 Eq. 10.4 limits tailwater to 0.4–1.0 effective diameters. USDA classifies site tailwater at 0.5 outlet diameters. For supercritical flow, the effective diameter is the mean of outlet diameter and normal depth. Apron dimensions follow the next qualifying example class in HEC-14 Table 10.1 with a 1:3 flare per side. Larger sizes or tailwater beyond the equation range need site-specific outlet protection analysis.

Open the main calculator

Share this calculation

This link opens the worksheet with your current inputs and units.