Worked example · Conveyance
HEC-22 roadway grate and spread check
Use the approach flow, 4% cross slope and grate dimensions from the HEC-22 roadway sequence example. Use negligible splash-over at the calculated approach velocity.
Inputs
Curb and gutter cutaway
Live resultsSpread and depth within limits
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Calculation results
- Spread
- 5.97 ft
- Curb depth
- 0.239 ft
- Grate capture
- 2.4 cfs
- Curb capture
- 1.15 cfs
- Approach velocity
- 4.66 ft/s
- Frontal flow Eₒ
- 66.3 %
- Grate efficiency
- 72.2 %
- Curb efficiency
- 34.5 %
- Grate bypass flow
- 0.92 cfs
- Curb bypass flow
- 2.17 cfs
- Curb length for full capture
- 28.61 ft
- Spread reserve
- 1.03 ft
- Curb height reserve
- 0.261 ft
Worked calculation
The spread is about 6 ft and the 2 by 3 ft grate captures about 2.39 cfs. Compare the remainder with the next downstream inlet.
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.
More worked examples
Open the main calculatorHEC-22 roadway grate and spread check
Inputs
- Approach flow Q
- 3.32 cfs
- Longitudinal grade
- 3 %
- Pavement cross slope
- 4 %
- Manning n
- 0.016
- Allowable spread
- 7 ft
- Curb height
- 6 in
- Grate width
- 2 ft
- Grate length
- 3 ft
- Grate splash-over Vₒ
- 6 ft/s
- Curb opening length
- 6 ft
Results
- Spread
- 5.97 ft
- Curb depth
- 0.239 ft
- Grate capture
- 2.4 cfs
- Curb capture
- 1.15 cfs
- Approach velocity
- 4.66 ft/s
- Frontal flow Eₒ
- 66.3 %
- Grate efficiency
- 72.2 %
- Curb efficiency
- 34.5 %
- Grate bypass flow
- 0.92 cfs
- Curb bypass flow
- 2.17 cfs
- Curb length for full capture
- 28.61 ft
- Spread reserve
- 1.03 ft
- Curb height reserve
- 0.261 ft
Spread and depth within limits
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.