Worked example · Conveyance
Downtown gutter on a flat grade
A gently sloping block collects flow along a curb next to an active travel lane. Available spread is limited to 5.5 ft.
Inputs
Curb and gutter cutaway
Live resultsAllowable spread exceeded
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Calculation results
- Spread
- 12.66 ft
- Curb depth
- 0.253 ft
- Grate capture
- 1.5 cfs
- Curb capture
- 1.53 cfs
- Approach velocity
- 1.56 ft/s
- Frontal flow Eₒ
- 36.8 %
- Grate efficiency
- 60.2 %
- Curb efficiency
- 61.4 %
- Grate bypass flow
- 1 cfs
- Curb bypass flow
- 0.97 cfs
- Curb length for full capture
- 19.48 ft
- Spread reserve
- -7.16 ft
- Curb height reserve
- 0.247 ft
Worked calculation
Adjust approach flow to find how much bypass can reach this block before the spread exceeds the entered lane width.
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.
More worked examples
Open the main calculatorDowntown gutter on a flat grade
Inputs
- Approach flow Q
- 2.5 cfs
- Longitudinal grade
- 0.35 %
- Pavement cross slope
- 2 %
- Manning n
- 0.017
- Allowable spread
- 5.5 ft
- Curb height
- 6 in
- Grate width
- 2 ft
- Grate length
- 2.7 ft
- Grate splash-over Vₒ
- 5.5 ft/s
- Curb opening length
- 8 ft
Results
- Spread
- 12.66 ft
- Curb depth
- 0.253 ft
- Grate capture
- 1.5 cfs
- Curb capture
- 1.53 cfs
- Approach velocity
- 1.56 ft/s
- Frontal flow Eₒ
- 36.8 %
- Grate efficiency
- 60.2 %
- Curb efficiency
- 61.4 %
- Grate bypass flow
- 1 cfs
- Curb bypass flow
- 0.97 cfs
- Curb length for full capture
- 19.48 ft
- Spread reserve
- -7.16 ft
- Curb height reserve
- 0.247 ft
Allowable spread exceeded
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.