Conveyance

HEC-22 Gutter Spread & Inlet Calculator

Solve pavement spread, check lane and curb limits, and compare on-grade capture for a grate or curb opening.

Inputs

Street section
0–200 cfs
0.02–20 %
0.1–20 %
0.008–0.06
0.5–60 ft
1–24 in
On-grade inlets
0.25–15 ft
0.25–30 ft
0–30 ft/s
0.25–100 ft

Take grate splash-over velocity from HEC-22 Figure 7.8 or grate test data.

Curb and gutter cutaway

Live results
Curb and gutter cutaway Spread and depth within limits. Grate and curb opening are independent capture alternatives. SPREAD 5.97 ft CURB DEPTH 0.239 ft GRATE CAPTURE 2.4 cfs CURB CAPTURE 1.15 cfs CurbLane limit · 7 ftSpread T · 5.97 ft CurbSpread limit2× limit

Spread and depth within limits

Grate and curb opening are independent capture alternatives.

HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).

Calculation results

Spread
5.97 ft
Curb depth
0.239 ft
Grate capture
2.4 cfs
Curb capture
1.15 cfs
Approach velocity
4.66 ft/s
Frontal flow Eₒ
66.3 %
Grate efficiency
72.2 %
Curb efficiency
34.5 %
Grate bypass flow
0.92 cfs
Curb bypass flow
2.17 cfs
Curb length for full capture
28.61 ft
Spread reserve
1.03 ft
Curb height reserve
0.261 ft

Method and assumptions

Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.

Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.

Share this calculation

This link opens the worksheet with your current inputs and units.