Worked example · Conveyance
Grate splash-over on a steep street
A steep street conveys fast flow to an on-grade grate with a low measured splash-over velocity.
Inputs
Curb and gutter cutaway
Live resultsSpread and depth within limits
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Calculation results
- Spread
- 6.37 ft
- Curb depth
- 0.331 ft
- Grate capture
- 2.99 cfs
- Curb capture
- 1.98 cfs
- Approach velocity
- 10.9 ft/s
- Frontal flow Eₒ
- 73.5 %
- Grate efficiency
- 26 %
- Curb efficiency
- 17.2 %
- Grate bypass flow
- 8.51 cfs
- Curb bypass flow
- 9.52 cfs
- Curb length for full capture
- 60.11 ft
- Spread reserve
- 1.63 ft
- Curb height reserve
- 0.169 ft
Worked calculation
Raise the splash-over threshold to compare a better grate at the same spread. The curb-opening alternative is independent of that grate setting.
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.
More worked examples
Open the main calculatorGrate splash-over on a steep street
Inputs
- Approach flow Q
- 11.5 cfs
- Longitudinal grade
- 8.1 %
- Pavement cross slope
- 5.2 %
- Manning n
- 0.014
- Allowable spread
- 8 ft
- Curb height
- 6 in
- Grate width
- 2.5 ft
- Grate length
- 3 ft
- Grate splash-over Vₒ
- 3.5 ft/s
- Curb opening length
- 6 ft
Results
- Spread
- 6.37 ft
- Curb depth
- 0.331 ft
- Grate capture
- 2.99 cfs
- Curb capture
- 1.98 cfs
- Approach velocity
- 10.9 ft/s
- Frontal flow Eₒ
- 73.5 %
- Grate efficiency
- 26 %
- Curb efficiency
- 17.2 %
- Grate bypass flow
- 8.51 cfs
- Curb bypass flow
- 9.52 cfs
- Curb length for full capture
- 60.11 ft
- Spread reserve
- 1.63 ft
- Curb height reserve
- 0.169 ft
Spread and depth within limits
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.