Worked example · Conveyance
HEC-22 uniform curb-opening interception
A uniform street section has a 9.84 ft curb opening, 1% longitudinal grade and 2% cross slope, following HEC-22 Example 7.2A.
Inputs
Curb and gutter cutaway
Live resultsAllowable spread exceeded
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Calculation results
- Spread
- 8.93 ft
- Curb depth
- 0.179 ft
- Grate capture
- 1.13 cfs
- Curb capture
- 1.09 cfs
- Approach velocity
- 2.22 ft/s
- Frontal flow Eₒ
- 49.1 %
- Grate efficiency
- 63.6 %
- Curb efficiency
- 61.4 %
- Grate bypass flow
- 0.64 cfs
- Curb bypass flow
- 0.68 cfs
- Curb length for full capture
- 23.94 ft
- Spread reserve
- -0.93 ft
- Curb height reserve
- 0.321 ft
Worked calculation
Compare the computed length for full interception with the available opening. The bypass is the uncollected fraction.
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Uniform triangular pavement and separate on-grade inlet alternatives. Spread above the curb is outside this model, as are sag flow, depressed gutters, debris, clogging and surcharge. Curb capture uses HEC-22 Equations 7.10 and 7.13. Equation 7.10 can underestimate the required opening length, especially for openings of 10 ft (3.05 m) or more. See FHWA-HRT-22-061 for the alternative method. Results use the published US coefficients and convert to SI.
More worked examples
Open the main calculatorHEC-22 uniform curb-opening interception
Inputs
- Approach flow Q
- 1.77 cfs
- Longitudinal grade
- 1 %
- Pavement cross slope
- 2 %
- Manning n
- 0.016
- Allowable spread
- 8 ft
- Curb height
- 6 in
- Grate width
- 2 ft
- Grate length
- 3 ft
- Grate splash-over Vₒ
- 5.5 ft/s
- Curb opening length
- 9.84 ft
Results
- Spread
- 8.93 ft
- Curb depth
- 0.179 ft
- Grate capture
- 1.13 cfs
- Curb capture
- 1.09 cfs
- Approach velocity
- 2.22 ft/s
- Frontal flow Eₒ
- 49.1 %
- Grate efficiency
- 63.6 %
- Curb efficiency
- 61.4 %
- Grate bypass flow
- 0.64 cfs
- Curb bypass flow
- 0.68 cfs
- Curb length for full capture
- 23.94 ft
- Spread reserve
- -0.93 ft
- Curb height reserve
- 0.321 ft
Allowable spread exceeded
Grate and curb opening are independent capture alternatives.
HEC-22 Equation 7.10 may overstate curb capture for longer openings. Check the FHWA-HRT-22-061 method when the entered or estimated full-capture length reaches 10 ft (3.05 m).
Q = (Kᵤ/n) Sₓ⁵ᐟ³ Sₗ¹ᐟ² T⁸ᐟ³ · d = TSₓ · Eₒ = 1 − (1 − min(W/T, 1))⁸ᐟ³.
Screening worksheet · Verify design using project criteria and site data.