Fence layout

Fence Post, Concrete & Gravel Calculator

Space a straight fence run, compare racked and stepped panels, and estimate concrete and gravel at each post.

Project inputs

Fence run
ft
ft
ft
ft
Post and hole materials
in
in
in
%
Wind and lateral soil
psf
Pressure on the gross fence face.
psf/ft
Use the value accepted for the site soil.
See results

Results

Updates as you type
Posts including both ends
11
Modeled concrete embedment
85 in
80 lb bags per post
10

Fence grade and post section

Schematic
Fence grade and post section Racked privacy fence7 of 10 bays shown · 8 ft OCPost section85 in embedment6 in gravel

Calculation details

Posts including both ends
11
Modeled concrete embedment
85 in
80 lb bags per post
10
Equal fence bays
10
Horizontal post spacing
8 ft
Rail-line length per bay
8 ft
Ground change per racked bay
0 ft
Rails in the material estimate
30
Wind force per interior post
720 lb
Wind-only soil embedment screen
84.3 in
Total hole depth with gravel
91 in
Longest estimated post stock
13.08 ft
Concrete per post before waste
4.961 ft³
Total bags, rounded per hole
110
Total gravel base
4.32 ft³

Checks and references

  • Reference
    Wind and lateral soil assumptions

    Use a site-specific allowable-stress net wind pressure on the gross projected fence area and a locally verified lateral soil value. The estimate uses the unconstrained IBC 1807.3.2.1 screen.

  • Reference
    Post, panels and gates

    Check post bending, hardware, panel span, corner and gate loads, local fence rules and frost requirements with the authority having jurisdiction.

How the calculation works

The steps use US customary units for the reference formulas.

  1. Space the fence posts

    Divide the 80 ft racked rail line by the entered bay limit and round up. 10 bays take 11 posts at 8 ft horizontally.

  2. Estimate the wind embedment

    15 psf × 6 ft × 8 ft = 720 lb per interior post. The unconstrained embedded-post equation gives 84.32 in for the entered soil gradient and lateral load at half height.

  3. Order concrete and gravel

    Use 85 in embedment and 6 in gravel. Subtract the embedded post volume from the cylinder, apply waste, and round per hole to 10 bags. Gravel is 4.32 ft³ total.

  4. Set panel elevations

    Slope the rails to follow the grade. Each bay changes elevation by 0 ft with a 8 ft rail line before end allowances.

Frequently asked questions

How are fence bags rounded when every hole is poured separately?

The calculator rounds up at each hole after deducting the embedded post volume and applying waste. It multiplies that per-hole number by the post count.

What changes when a fence is racked instead of stepped?

Racked panels follow the grade, so rails run along the sloped line. Stepped panels stay level within each bay and change height at the posts.

Other calculators