Civil aviation case

Airport avionics board inventory

An airport test and service center supports 36 interchangeable boards with a 10-day replenishment window.

Inputs

h
h
0–1
cost units
Blank uses the computed minimum stock.
PassStock covers the protection target
Minimum stock
1
Protection
99.5857%
Mean demand
0.093913
Backorders
4.275e-3

Lead-time demand and stock protection

Poisson demand probability and shelf-stock protectionDemand probability · PMF0%51.4%103%0134Lead-time demandStock protection · CDF0%50%100%0134Spare units on shelfProtectionStock / goal

Demand bars show the PMF and the line shows the cumulative probability of covering demand with a given stock level.

Download

Detailed results

Evaluated shelf stock
1 units
Stockout probability
0.41432207 %
Protection target
99 %
Shelf inventory value
4,200 cost units

Rare demand can still merit stock if the required probability of avoiding a shortage is high.

Formula trace

  1. λ = M L / MTBFOver the replenishment window the fleet has mean demand 0.09391304.
  2. Pr(D ≤ S) = Q(S+1, λ)For S = 1, the cycle protection probability is 0.99585678.
  3. S* = min {S ≥ 0 : Pr(D ≤ S) ≥ P*}The minimum whole stock is 1.
  4. EBO(S) = ∑ (d−S) Pr(D=d) for d > SExpected backlog is 0.004274964 units per lead-time window.

Model assumptions

Demand is independent with constant rates and fixed replenishment lead time. Protection is cycle service probability Pr(D ≤ S). Inventory value is purchase cost times stocked units.

Method and sources

Related examples