Industrial automation case

Industrial PLC distribution spares

A depot supports 80 PLCs with a 60-day lead time and 110,000-hour MTBF. Find a shelf stock target at 97% protection.

Inputs

h
h
0–1
cost units
Blank uses the computed minimum stock.
PassStock covers the protection target
Minimum stock
3
Protection
97.7975%
Mean demand
1.04727
Backorders
0.0273417

Lead-time demand and stock protection

Poisson demand probability and shelf-stock protectionDemand probability · PMF0%20.8%41.5%03710Lead-time demandStock protection · CDF0%50%100%03710Spare units on shelfProtectionStock / goal

Demand bars show the PMF and the line shows the cumulative probability of covering demand with a given stock level.

Download

Detailed results

Evaluated shelf stock
3 units
Stockout probability
2.20246469 %
Protection target
97 %
Shelf inventory value
3,750 cost units

Compare inventory value across targets. Raising the target changes the recommended stock in whole-unit steps.

Formula trace

  1. λ = M L / MTBFOver the replenishment window the fleet has mean demand 1.047273.
  2. Pr(D ≤ S) = Q(S+1, λ)For S = 3, the cycle protection probability is 0.97797535.
  3. S* = min {S ≥ 0 : Pr(D ≤ S) ≥ P*}The minimum whole stock is 3.
  4. EBO(S) = ∑ (d−S) Pr(D=d) for d > SExpected backlog is 0.02734172 units per lead-time window.

Model assumptions

Demand is independent with constant rates and fixed replenishment lead time. Protection is cycle service probability Pr(D ≤ S). Inventory value is purchase cost times stocked units.