Industrial automation case

Robot servo long-lead spare stock

A distribution center supports 220 robot axes with a 75-day lead time for new servo modules.

Inputs

h
h
0–1
cost units
Blank uses the computed minimum stock.
PassStock covers the protection target
Minimum stock
14
Protection
99.9603%
Mean demand
5.28
Backorders
5.781e-4

Lead-time demand and stock protection

Poisson demand probability and shelf-stock protectionDemand probability · PMF0%9.84%19.7%081523Lead-time demandStock protection · CDF0%50%100%081523Spare units on shelfProtectionStock / goal

Demand bars show the PMF and the line shows the cumulative probability of covering demand with a given stock level.

Download

Detailed results

Evaluated shelf stock
14 units
Stockout probability
0.03966309 %
Protection target
99.9 %
Shelf inventory value
47,600 cost units

Lead time scales demand directly. Test shorter lead times to estimate the inventory value tied up by procurement delays.

Formula trace

  1. λ = M L / MTBFOver the replenishment window the fleet has mean demand 5.28.
  2. Pr(D ≤ S) = Q(S+1, λ)For S = 14, the cycle protection probability is 0.99960337.
  3. S* = min {S ≥ 0 : Pr(D ≤ S) ≥ P*}The minimum whole stock is 14.
  4. EBO(S) = ∑ (d−S) Pr(D=d) for d > SExpected backlog is 0.0005780704 units per lead-time window.

Model assumptions

Demand is independent with constant rates and fixed replenishment lead time. Protection is cycle service probability Pr(D ≤ S). Inventory value is purchase cost times stocked units.

Method and sources

Related examples