PLC power module run-to-failure case
The modeled power module has constant hazard with a Weibull shape of 1. The planned replacement is cheaper than a repair following failure.
Run-to-failure optimal (preventive replacement counterproductive)
Inputs
- Weibull shape β
- 1
- Characteristic life η
- 36,000 h
- Planned replacement cost Cₚ
- 850 cost units
- Failure replacement cost C𝒻
- 2,200 cost units
Results
- Optimal age
- ∞ h
- Optimal rate
- 0.06111111 /h
- Run-to-fail
- 0.06111111 /h
- Cost savings
- 0 %
- Weibull mean life
- 36,000 h
- Planned replacement cost
- 850 cost units
- Failure replacement cost
- 2,200 cost units
E[cycle time] = ∫₀ᵀ exp[−(u/η)ᵝ] duIntegrate the reliability curve by composite Gauss–Legendre quadrature.C(T) = [Cₚ R(T) + C𝒻 F(T)] / E[cycle time]Use the run-to-failure limit for the reported policy.Run-to-failure cost rate = C𝒻 / MTTFThe failure-only policy costs 0.06111111 per hour.Savings = 1 − C(T*) / C(∞)The modeled saving is 0%.
Replacement restores the item to as-new condition. Costs must share the same currency and include the relevant labor and outage cost. The model assumes independent lifetimes and no replacement delay.