Industrial electronics case

PLC power module run-to-failure case

The modeled power module has constant hazard with a Weibull shape of 1. The planned replacement is cheaper than a repair following failure.

Inputs

h
cost units
cost units
ReviewRun-to-failure optimal (preventive replacement counterproductive)
Optimal age
∞h
Optimal rate
0.0611111/h
Run-to-fail
0.0611111/h
Cost savings
0%

Age replacement cost rate

Preventive replacement cost rate versus ageRenewal cost rate · per h00.1230.24750404.2e47.8e41.2e5Replacement age (h)Age policyRun to failure

The horizontal reference is the long-run run-to-failure rate. The marker identifies the finite optimum when the model has one.

Download

Detailed results

Weibull mean life
36,000 h
Planned replacement cost
850 cost units
Failure replacement cost
2,200 cost units

With constant hazard, replacing a working unit does not improve its modeled hazard. Any paid preventive change increases long-run cost.

Formula trace

  1. E[cycle time] = ∫₀ᵀ exp[−(u/η)ᵝ] duIntegrate the reliability curve by composite Gauss–Legendre quadrature.
  2. C(T) = [Cₚ R(T) + C𝒻 F(T)] / E[cycle time]Use the run-to-failure limit for the reported policy.
  3. Run-to-failure cost rate = C𝒻 / MTTFThe failure-only policy costs 0.06111111 per hour.
  4. Savings = 1 − C(T*) / C(∞)The modeled saving is 0%.

Model assumptions

Replacement restores the item to as-new condition. Costs must share the same currency and include the relevant labor and outage cost. The model assumes independent lifetimes and no replacement delay.