Regional server PSU depot stock
A regional depot serves 3,200 PSUs with 250,000-hour MTBF and a 14-day lead time. Compare seven stocked spares with the 99.5% target.
Stock falls below the protection target
Inputs
- Fleet units M
- 3,200
- Unit MTBF
- 250,000 h
- Replenishment lead time
- 336 h
- Protection target P*
- 0.995 0–1
- Cost per spare
- 260 cost units
- Stock on hand
- 7
Results
- Minimum stock
- 10
- Protection
- 92.89097381 %
- Mean demand
- 4.3008
- Backorders
- 0.1229965
- Evaluated shelf stock
- 7 units
- Stockout probability
- 7.10902619 %
- Protection target
- 99.5 %
- Shelf inventory value
- 1,820 cost units
λ = M L / MTBFOver the replenishment window the fleet has mean demand 4.3008.Pr(D ≤ S) = Q(S+1, λ)For S = 7, the cycle protection probability is 0.92890974.S* = min {S ≥ 0 : Pr(D ≤ S) ≥ P*}The minimum whole stock is 10.EBO(S) = ∑ (d−S) Pr(D=d) for d > SExpected backlog is 0.1229965 units per lead-time window.
Demand is independent with constant rates and fixed replenishment lead time. Protection is cycle service probability Pr(D ≤ S). Inventory value is purchase cost times stocked units.