A faster travel trial on a short solid-wire seam is compared against the same qualified heat-input window.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Arc parameters
V
A
in/min
in
in/min
WPS limits
kJ/in
kJ/in

Live weld sheet

Updated from inputs
Arc and weld poolNet heat input 6.264 kJ/in. Electrical arc energy 7.83 kJ/in. Thermal efficiency 80 %. Arc power 3.65 kW NET HEAT6.264kJ/inARC ENERGY7.83kJ/inTHERMAL EFF.80%ARC POWER3.65kW ARC AND WELD POOL Travel 28 in/minArc 7.83 kJ/inGMAW NET HEAT WINDOWFAIL
Outside screen

Net heat window · 8.89 kJ/in to 17.78 kJ/in on an efficiency-adjusted basis.

Result details

Net heat input6.264 kJ/in
Electrical arc energy7.83 kJ/in
Thermal efficiency80 %
Arc power3.65 kW
Energy used for check6.264 kJ/in
Solid steel wire feed (mass)4.69 lb/h
Estimated net wire deposition4.31 lb/h
Entered window minimum8.89 kJ/in
Entered window maximum17.78 kJ/in
Distance to nearest bound-2.626 kJ/in

Worked example

Starting inputs

Arc voltage
21 V
Arc current
174 A
Travel speed
28 in/min
Wire diameter
0.035433 in
Wire feed speed
279.527559 in/min
Minimum energy
8.89 kJ/in
Maximum energy
17.78 kJ/in

Baseline results

Net heat input
6.264 kJ/in
Electrical arc energy
7.83 kJ/in
Thermal efficiency
80 %
Arc power
3.65 kW

With 3.65 kW at 28 in/min travel, electrical arc energy is 7.83 kJ/in. The 80 % process factor gives 6.264 kJ/in of net heat input.

Try it. Inspect the negative distance to the closest limit. This indicates how far the trial lies below the selected window.

Calculation method

Arc energy = 60P / v · Net heat input = η × 60P / v

Use P in kW and travel v in mm/min for kJ/mm. Electrical power comes from V × I / 1,000 or from measured mean instantaneous V × I during the run. For waveform-controlled welding, use the acquisition method required by the governing procedure.

Planning thermal factors are SAW 1.00, GMAW/FCAW/SMAW 0.80 and GTAW 0.60. Use WPS bounds expressed on the same basis as the selected result. Wire figures use a solid-steel equivalent of 7,850 kg/m³. Tubular wire needs measured linear mass for a production estimate.