SAW longitudinal seam at high power

A mechanized submerged-arc run uses a high-current electrode on a long shop seam.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Arc parameters
V
A
in/min
in
in/min
WPS limits
kJ/in
kJ/in

Live weld sheet

Updated from inputs
Arc and weld poolNet heat input 49.6 kJ/in. Electrical arc energy 49.6 kJ/in. Thermal efficiency 100 %. Arc power 19.84 kW NET HEAT49.6kJ/inARC ENERGY49.6kJ/inTHERMAL EFF.100%ARC POWER19.84kW ARC AND WELD POOL Travel 24 in/minArc 49.6 kJ/inSAW NET HEAT WINDOWPASS
Pass · within screen

Net heat window · 30.48 kJ/in to 55.88 kJ/in on an efficiency-adjusted basis.

Result details

Net heat input49.6 kJ/in
Electrical arc energy49.6 kJ/in
Thermal efficiency100 %
Arc power19.84 kW
Energy used for check49.6 kJ/in
Solid steel wire feed (mass)22.55 lb/h
Estimated net wire deposition22.1 lb/h
Entered window minimum30.48 kJ/in
Entered window maximum55.88 kJ/in
Distance to nearest bound6.28 kJ/in

Worked example

Starting inputs

Welding process
SAW
Arc voltage
32 V
Arc current
620 A
Travel speed
24 in/min
Wire diameter
0.125984 in
Wire feed speed
106.299213 in/min
Minimum energy
30.48 kJ/in

Baseline results

Net heat input
49.6 kJ/in
Electrical arc energy
49.6 kJ/in
Thermal efficiency
100 %
Arc power
19.84 kW

With 19.84 kW at 24 in/min travel, electrical arc energy is 49.6 kJ/in. The 100 % process factor gives 49.6 kJ/in of net heat input.

Try it. With the 1.00 planning factor, arc energy and net heat input coincide numerically.

Calculation method

Arc energy = 60P / v · Net heat input = η × 60P / v

Use P in kW and travel v in mm/min for kJ/mm. Electrical power comes from V × I / 1,000 or from measured mean instantaneous V × I during the run. For waveform-controlled welding, use the acquisition method required by the governing procedure.

Planning thermal factors are SAW 1.00, GMAW/FCAW/SMAW 0.80 and GTAW 0.60. Use WPS bounds expressed on the same basis as the selected result. Wire figures use a solid-steel equivalent of 7,850 kg/m³. Tubular wire needs measured linear mass for a production estimate.