WeldMetalLab

API 1104 · ASME B31.3

Pipe Butt-Weld Bevel, Passes & Cycle

Size a V or compound girth weld and estimate filler, pass count and joint cycle time from the groove geometry.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Pipe & preparation
°
mm
mm
%
Passes & cycle
kg/m³
mm²
mm
mm/min
mm/min
mm/min
min
min

Live weld sheet

Updated from inputs
Girth-weld groove sectionDeposited filler per joint 0.277 kg. Estimated passes 4. Joint arc time 16.82 min. Total joint cycle 28.82 min NET FILLER0.277kgPASS COUNT4ARC TIME16.82minJOINT CYCLE28.82min GIRTH-WELD GROOVE SECTION Wall 8.18 mmR1 · H1 · F1 · C1NPS 8 CYCLE TIME BUDGETPASS
Pass · within screen

Cycle time budget · 28.82 min planned vs 45 min budget.

Result details

Deposited filler per joint0.277 kg
Estimated passes4
Joint arc time16.82 min
Total joint cycle28.82 min
Effective wall8.18 mm
Pipe outside diameter219.075 mm
Pipe bore202.715 mm
Groove centroid circumference668.77 mm
Outside circumference688.24 mm
Root circumference636.85 mm
Groove mouth width10.398 mm
Uncapped groove section47.901 mm²
Groove and cap volume35.33 cm³
Filler purchase per joint0.301 kg
Root passes1
Hot passes1
Fill passes1
Cap beads1
Cycle time margin16.18 min

Calculation method

V = ∫ 2πr·w(r)dr + A꜀·π·OD · Arc time = Σ pass length / travel speed

The model integrates the piecewise linear groove width at each radius. Cap reinforcement is a percentage of groove area revolved at the outside diameter. Schedule presets cover a subset of common B36.10 walls. Confirm actual wall and ovality at the joint.

Reserve one root pass and an optional hot pass. Cap beads must cover the groove mouth and deposit the entered extra cap area. Root, hot and cap allowances are 0.60, 0.75 and 0.80 times the entered fill area per pass. Apply the unused cap-bead area to the groove, then round up the remaining fill passes. Root, hot/fill and cap times use the root, centroid and outside circumferences.

Cycle time adds the entered fit-up, interpass and handling allowance. Actual pass placement, reinforcement profile, deposition rates and essential variables come from the qualified procedure.

References

Worked examples